Manufacturing, Agriculture & Environment Workflows
Version: 1.0.0 Last Updated: December 12, 2025 Purpose: Industry-specific workflow catalog for manufacturing, supply chain, agriculture, environmental, and construction domains
Table of Contents
- Manufacturing Production
- Supply Chain & Logistics
- Agriculture & Farming
- Environmental & Sustainability
- Construction Projects
1. Manufacturing Production
1. production-planning-workflow
- Description: Create production schedules, allocate resources, and optimize manufacturing timelines based on orders and capacity
- Trigger:
/plan-productionor manual - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /analyze, /optimize
- Steps:
- Order analysis - data-analyst - Review pending orders and priority levels
- Capacity assessment - orchestrator - Analyze available equipment and workforce
- Schedule optimization - project-architect - Create optimal production timeline
- Resource allocation - orchestrator - Assign equipment, personnel, and materials
- Bottleneck identification - data-analyst - Identify and mitigate capacity constraints
- Plan validation - component-qa-validator - Verify feasibility and compliance
- Schedule publication - codi-documentation-writer - Generate production schedules
- Tags: [manufacturing, planning, scheduling, optimization, capacity]
2. work-order-management
- Description: Create, track, and manage manufacturing work orders from initiation to completion
- Trigger:
/create-work-orderor manual - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect
- Commands: /new-project, /track-progress
- Steps:
- Work order creation - project-architect - Generate work order with specifications
- BOM validation - component-qa-validator - Verify bill of materials completeness
- Resource assignment - orchestrator - Assign equipment and personnel
- Progress tracking - orchestrator - Monitor work order status and milestones
- Quality checkpoints - component-qa-validator - Validate quality at key stages
- Completion verification - component-qa-reviewer - Verify final output meets specs
- Tags: [manufacturing, work-orders, tracking, production]
3. quality-control-inspection
- Description: Perform systematic quality inspections during and after production with statistical process control
- Trigger:
/quality-inspector scheduled - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: component-qa-validator, component-qa-reviewer, data-analyst
- Commands: /run-tests, /analyze
- Steps:
- Inspection planning - component-qa-validator - Define inspection points and criteria
- Sample collection - orchestrator - Collect representative samples per SPC standards
- Measurement execution - component-qa-validator - Perform dimensional and functional tests
- Statistical analysis - data-analyst - Analyze measurements against control limits
- Defect categorization - component-qa-reviewer - Classify any non-conformances
- Corrective action - orchestrator - Initiate corrective actions if needed
- Documentation - codi-documentation-writer - Record inspection results
- Tags: [quality, inspection, testing, spc, compliance]
4. equipment-maintenance-workflow
- Description: Schedule preventive maintenance, track equipment health, and manage maintenance work orders
- Trigger:
/schedule-maintenanceor time-based - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: devops-engineer, orchestrator, data-analyst
- Commands: /monitor, /schedule
- Steps:
- Equipment monitoring - data-analyst - Track equipment performance metrics
- Maintenance scheduling - orchestrator - Create preventive maintenance schedule
- Work order generation - devops-engineer - Generate maintenance work orders
- Downtime planning - project-architect - Schedule maintenance during low-demand periods
- Parts procurement - orchestrator - Order replacement parts and consumables
- Maintenance execution - devops-engineer - Perform maintenance tasks
- Equipment validation - component-qa-validator - Verify equipment functionality post-maintenance
- Documentation - codi-documentation-writer - Update maintenance logs
- Tags: [maintenance, equipment, preventive, scheduling, reliability]
5. inventory-management-workflow
- Description: Track raw materials, work-in-progress, and finished goods inventory with automated reordering
- Trigger:
/inventory-checkor automated - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: optional
- Dependencies:
- Agents: data-analyst, orchestrator
- Commands: /analyze, /optimize
- Steps:
- Inventory audit - data-analyst - Count and verify current inventory levels
- Usage analysis - data-analyst - Analyze consumption patterns and trends
- Reorder point calculation - orchestrator - Calculate optimal reorder points
- Procurement trigger - orchestrator - Generate purchase requisitions when needed
- Inventory optimization - data-analyst - Recommend inventory reduction opportunities
- Reporting - codi-documentation-writer - Generate inventory status reports
- Tags: [inventory, materials, tracking, optimization, procurement]
6. shift-scheduling-workflow
- Description: Create and optimize employee shift schedules balancing coverage, H.P.003-SKILLS, and labor regulations
- Trigger:
/schedule-shiftsor weekly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /optimize, /validate
- Steps:
- Demand forecasting - data-analyst - Predict staffing needs by shift
- Skills assessment - orchestrator - Identify required H.P.003-SKILLS per shift
- Availability collection - orchestrator - Gather employee availability and preferences
- Schedule optimization - project-architect - Create optimal shift assignments
- Compliance check - component-qa-validator - Verify labor law and union compliance
- Conflict resolution - orchestrator - Resolve scheduling conflicts
- Schedule publication - codi-documentation-writer - Publish and notify employees
- Tags: [scheduling, workforce, optimization, compliance, labor]
7. safety-compliance-tracking
- Description: Monitor workplace safety, track incidents, conduct safety audits, and ensure OSHA compliance
- Trigger:
/safety-auditor scheduled - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: security-specialist, component-qa-validator, codi-documentation-writer
- Commands: /security-scan, /audit
- Steps:
- Safety inspection - security-specialist - Conduct workplace safety walkthrough
- Hazard identification - security-specialist - Identify potential safety hazards
- Incident review - component-qa-reviewer - Analyze recent safety incidents
- Compliance check - component-qa-validator - Verify OSHA and regulatory compliance
- Training assessment - orchestrator - Identify safety training needs
- Corrective actions - orchestrator - Implement safety improvements
- Documentation - codi-documentation-writer - Update safety records and reports
- Tags: [safety, compliance, osha, audit, workplace]
8. defect-tracking-workflow
- Description: Log manufacturing defects, perform root cause analysis, and implement corrective actions
- Trigger:
/log-defector on-detection - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: component-qa-validator, data-analyst, orchestrator
- Commands: /analyze, /debug
- Steps:
- Defect logging - component-qa-validator - Record defect details and classification
- Impact assessment - data-analyst - Analyze defect frequency and severity
- Root cause analysis - orchestrator - Investigate underlying causes using 5-Why
- Corrective action plan - project-architect - Define corrective and preventive actions
- Implementation - orchestrator - Execute corrective actions
- Verification - component-qa-validator - Verify defect resolution
- Trending analysis - data-analyst - Track defect trends over time
- Tags: [quality, defects, root-cause, corrective-action, tracking]
9. supplier-coordination-workflow
- Description: Manage supplier relationships, track performance, and coordinate material deliveries
- Trigger:
/supplier-reviewor scheduled - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: recommended
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, component-qa-validator
- Commands: /analyze, /track-progress
- Steps:
- Supplier performance tracking - data-analyst - Monitor on-time delivery and quality metrics
- Quality assessment - component-qa-validator - Evaluate incoming material quality
- Issue escalation - orchestrator - Address performance or quality issues
- Contract review - component-qa-reviewer - Review supplier contracts and terms
- Relationship management - orchestrator - Maintain supplier communications
- Supplier scorecard - codi-documentation-writer - Generate supplier performance reports
- Tags: [suppliers, procurement, relationships, quality, performance]
10. production-cost-tracking
- Description: Monitor and analyze manufacturing costs including materials, labor, overhead, and identify cost reduction opportunities
- Trigger:
/cost-analysisor monthly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, project-architect
- Commands: /analyze, /optimize
- Steps:
- Cost data collection - data-analyst - Gather material, labor, and overhead costs
- Cost allocation - orchestrator - Assign costs to products and work orders
- Variance analysis - data-analyst - Compare actual vs. standard costs
- Trend identification - data-analyst - Identify cost trends and anomalies
- Optimization opportunities - project-architect - Recommend cost reduction initiatives
- Budget forecasting - orchestrator - Project future costs based on trends
- Reporting - codi-documentation-writer - Generate cost analysis reports
- Tags: [costing, analysis, optimization, budget, variance]
2. Supply Chain & Logistics
11. demand-forecasting-workflow
- Description: Analyze historical data and market trends to predict future product demand and optimize inventory
- Trigger:
/forecast-demandor monthly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, project-architect
- Commands: /analyze, /optimize
- Steps:
- Historical analysis - data-analyst - Analyze past sales and demand patterns
- Trend identification - data-analyst - Identify seasonal and market trends
- Model development - data-analyst - Build forecasting models (time series, ML)
- Forecast generation - orchestrator - Generate demand forecasts by SKU
- Accuracy validation - component-qa-validator - Validate forecast accuracy
- Inventory planning - project-architect - Translate forecasts to inventory plans
- Stakeholder communication - codi-documentation-writer - Publish forecast reports
- Tags: [forecasting, demand, analytics, planning, inventory]
12. procurement-workflow
- Description: Manage purchase requisitions, vendor selection, purchase orders, and procurement tracking
- Trigger:
/create-poor on-demand - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, component-qa-validator, data-analyst
- Commands: /new-project, /track-progress
- Steps:
- Requisition review - orchestrator - Review and approve purchase requisitions
- Vendor selection - data-analyst - Identify and evaluate potential vendors
- Quote comparison - component-qa-validator - Compare vendor quotes and terms
- PO creation - orchestrator - Generate purchase orders
- Order tracking - orchestrator - Monitor order status and delivery dates
- Receipt verification - component-qa-validator - Verify received goods against PO
- Invoice reconciliation - orchestrator - Match invoices to POs and receipts
- Tags: [procurement, purchasing, vendors, orders, tracking]
13. warehouse-management-workflow
- Description: Optimize warehouse operations including receiving, putaway, picking, packing, and cycle counting
- Trigger:
/warehouse-optimizeor daily - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, devops-engineer
- Commands: /optimize, /monitor
- Steps:
- Receiving operations - orchestrator - Process incoming shipments and quality checks
- Putaway optimization - data-analyst - Determine optimal storage locations
- Pick list generation - orchestrator - Create optimized picking routes
- Inventory accuracy - component-qa-validator - Conduct cycle counts and audits
- Packing operations - orchestrator - Manage packing and shipping prep
- Space optimization - data-analyst - Analyze warehouse utilization
- Performance metrics - codi-documentation-writer - Track warehouse KPIs
- Tags: [warehouse, logistics, optimization, inventory, operations]
14. shipping-coordination-workflow
- Description: Coordinate outbound shipments, select carriers, generate shipping documents, and track deliveries
- Trigger:
/ship-orderor automated - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: optional
- Dependencies:
- Agents: orchestrator, devops-engineer
- Commands: /deploy, /track-progress
- Steps:
- Order consolidation - orchestrator - Group orders for efficient shipping
- Carrier selection - data-analyst - Select optimal carrier based on cost/speed
- Document generation - codi-documentation-writer - Generate BOLs, packing lists, labels
- Package preparation - orchestrator - Coordinate packing and labeling
- Pickup scheduling - devops-engineer - Schedule carrier pickup
- Shipment tracking - orchestrator - Monitor shipment status and ETA
- Customer notification - orchestrator - Send tracking information to customers
- Tags: [shipping, logistics, carriers, tracking, delivery]
15. carrier-management-workflow
- Description: Manage carrier relationships, track performance, negotiate rates, and optimize carrier mix
- Trigger:
/carrier-reviewor quarterly - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: recommended
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, component-qa-validator
- Commands: /analyze, /optimize
- Steps:
- Performance tracking - data-analyst - Monitor on-time delivery and damage rates
- Cost analysis - data-analyst - Analyze shipping costs by carrier and lane
- Service evaluation - component-qa-validator - Assess carrier service quality
- Rate negotiation - orchestrator - Negotiate carrier contracts and rates
- Carrier diversification - project-architect - Optimize carrier mix for resilience
- Scorecard generation - codi-documentation-writer - Create carrier performance reports
- Tags: [carriers, logistics, performance, optimization, contracts]
16. customs-import-workflow
- Description: Manage international shipments, customs documentation, duties/taxes, and regulatory compliance
- Trigger:
/process-importor on-arrival - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: orchestrator, security-specialist, codi-documentation-writer
- Commands: /validate, /security-scan
- Steps:
- Documentation preparation - codi-documentation-writer - Generate commercial invoice, packing list
- HS code classification - component-qa-validator - Classify products with HS codes
- Duty calculation - data-analyst - Calculate duties and taxes
- Compliance check - security-specialist - Verify regulatory compliance
- Customs filing - orchestrator - Submit electronic customs declarations
- Clearance tracking - orchestrator - Monitor customs clearance status
- Payment processing - orchestrator - Process duty and tax payments
- Tags: [customs, import, compliance, international, documentation]
17. returns-processing-workflow
- Description: Handle product returns, process refunds/exchanges, analyze return reasons, and update inventory
- Trigger:
/process-returnor on-request - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, component-qa-validator, data-analyst
- Commands: /validate, /analyze
- Steps:
- Return authorization - orchestrator - Review and approve RMA requests
- Receipt inspection - component-qa-validator - Inspect returned items
- Disposition decision - component-qa-reviewer - Determine restock, repair, or scrap
- Refund processing - orchestrator - Process refunds or exchanges
- Root cause analysis - data-analyst - Analyze return reasons and trends
- Inventory update - orchestrator - Update inventory with returned items
- Customer notification - orchestrator - Notify customer of return completion
- Tags: [returns, rma, refunds, quality, customer-service]
18. inventory-optimization-workflow
- Description: Analyze inventory levels, optimize safety stock, reduce excess, and improve inventory turnover
- Trigger:
/optimize-inventoryor monthly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, project-architect
- Commands: /analyze, /optimize
- Steps:
- ABC analysis - data-analyst - Classify inventory by value and velocity
- Inventory turnover - data-analyst - Calculate turnover ratios by SKU
- Safety stock calculation - orchestrator - Determine optimal safety stock levels
- Excess identification - data-analyst - Identify slow-moving and obsolete inventory
- Optimization recommendations - project-architect - Recommend inventory adjustments
- Disposition planning - orchestrator - Plan liquidation or usage of excess
- Implementation - orchestrator - Execute inventory optimization actions
- Tags: [inventory, optimization, analytics, turnover, safety-stock]
19. supplier-evaluation-workflow
- Description: Systematically evaluate supplier performance across quality, delivery, cost, and service dimensions
- Trigger:
/evaluate-supplieror quarterly - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: data-analyst, component-qa-validator, orchestrator
- Commands: /analyze, /full-review
- Steps:
- Metric collection - data-analyst - Gather quality, delivery, and cost metrics
- Performance scoring - component-qa-validator - Score suppliers on key criteria
- Trend analysis - data-analyst - Analyze performance trends over time
- Risk assessment - security-specialist - Evaluate supplier risk factors
- Benchmarking - data-analyst - Compare suppliers against industry standards
- Action planning - orchestrator - Define improvement plans or sourcing changes
- Scorecard publication - codi-documentation-writer - Generate supplier scorecards
- Tags: [suppliers, evaluation, performance, quality, risk]
20. delivery-tracking-workflow
- Description: Real-time tracking of shipments, proactive issue resolution, and customer delivery notifications
- Trigger: Automated on-shipment
- Complexity: simple
- Duration: 1-5m
- QA Integration:
- validation: optional
- review: none
- Dependencies:
- Agents: orchestrator, devops-engineer
- Commands: /monitor, /track-progress
- Steps:
- Tracking activation - orchestrator - Initiate tracking on shipment
- Status monitoring - devops-engineer - Monitor carrier tracking updates
- Exception detection - orchestrator - Identify delays or issues
- Proactive resolution - orchestrator - Address delivery exceptions
- ETA updates - orchestrator - Calculate and update delivery ETAs
- Customer notification - orchestrator - Send delivery status to customers
- Tags: [tracking, delivery, monitoring, customer-service, logistics]
3. Agriculture & Farming
21. crop-planning-workflow
- Description: Plan crop rotation, select varieties, allocate fields, and optimize planting schedules based on soil and climate
- Trigger:
/plan-cropsor seasonal - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /new-project, /optimize
- Steps:
- Field assessment - data-analyst - Analyze soil conditions and field history
- Crop selection - project-architect - Select optimal crops for rotation
- Variety selection - orchestrator - Choose varieties based on climate and market
- Field allocation - project-architect - Assign crops to fields
- Schedule optimization - data-analyst - Create planting schedule
- Input planning - orchestrator - Plan seed, fertilizer, and pesticide needs
- Documentation - codi-documentation-writer - Generate crop plan documents
- Tags: [agriculture, planning, crops, rotation, optimization]
22. planting-schedule-workflow
- Description: Create detailed planting schedules accounting for weather, soil conditions, and equipment availability
- Trigger:
/schedule-plantingor seasonal - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, project-architect
- Commands: /schedule, /optimize
- Steps:
- Weather analysis - data-analyst - Review historical and forecasted weather
- Soil readiness - component-qa-validator - Assess soil moisture and temperature
- Equipment scheduling - orchestrator - Allocate planting equipment and operators
- Seed preparation - orchestrator - Coordinate seed treatment and delivery
- Planting window - project-architect - Determine optimal planting dates
- Task sequencing - orchestrator - Sequence planting tasks by priority
- Schedule publication - codi-documentation-writer - Distribute planting schedule
- Tags: [agriculture, planting, scheduling, weather, equipment]
23. irrigation-management-workflow
- Description: Monitor soil moisture, optimize irrigation schedules, and manage water usage for crop health and conservation
- Trigger:
/manage-irrigationor daily - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: optional
- Dependencies:
- Agents: devops-engineer, data-analyst, orchestrator
- Commands: /monitor, /optimize
- Steps:
- Soil moisture monitoring - devops-engineer - Track soil moisture sensors
- Weather integration - data-analyst - Incorporate rainfall and ET data
- Irrigation scheduling - orchestrator - Calculate optimal irrigation timing
- Water allocation - project-architect - Allocate water across fields
- System activation - devops-engineer - Activate irrigation systems
- Efficiency tracking - data-analyst - Monitor water usage efficiency
- Reporting - codi-documentation-writer - Generate irrigation reports
- Tags: [agriculture, irrigation, water, monitoring, conservation]
24. pest-management-workflow
- Description: Monitor pest populations, implement integrated pest management, and track pesticide applications
- Trigger:
/monitor-pestsor weekly - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, component-qa-validator
- Commands: /monitor, /analyze
- Steps:
- Pest scouting - data-analyst - Monitor pest populations and damage
- Threshold analysis - component-qa-validator - Compare to economic thresholds
- Treatment planning - orchestrator - Select IPM tactics (cultural, biological, chemical)
- Application scheduling - project-architect - Schedule pesticide applications
- Application execution - devops-engineer - Execute pesticide applications
- Effectiveness monitoring - data-analyst - Track treatment effectiveness
- Compliance documentation - codi-documentation-writer - Record pesticide use
- Tags: [agriculture, pests, ipm, monitoring, pesticides]
25. harvest-planning-workflow
- Description: Plan harvest timing, allocate equipment and labor, coordinate storage and transportation
- Trigger:
/plan-harvestor seasonal - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /schedule, /optimize
- Steps:
- Maturity monitoring - data-analyst - Track crop maturity indicators
- Harvest timing - project-architect - Determine optimal harvest windows
- Equipment allocation - orchestrator - Schedule harvesters and trucks
- Labor scheduling - orchestrator - Schedule harvest crews
- Storage preparation - devops-engineer - Prepare grain bins or cold storage
- Transportation coordination - orchestrator - Arrange hauling logistics
- Market coordination - orchestrator - Coordinate with buyers and markets
- Tags: [agriculture, harvest, scheduling, logistics, planning]
26. yield-tracking-workflow
- Description: Monitor and analyze crop yields, compare to historical data, and identify improvement opportunities
- Trigger:
/track-yieldor post-harvest - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, component-qa-validator
- Commands: /analyze, /track-progress
- Steps:
- Yield measurement - data-analyst - Collect yield data from harvest equipment
- Quality assessment - component-qa-validator - Evaluate crop quality metrics
- Spatial analysis - data-analyst - Create yield maps and identify patterns
- Historical comparison - data-analyst - Compare to previous years
- Input correlation - data-analyst - Analyze relationship to inputs and practices
- Improvement identification - project-architect - Recommend yield improvements
- Documentation - codi-documentation-writer - Generate yield reports
- Tags: [agriculture, yield, analytics, quality, tracking]
27. equipment-maintenance-ag
- Description: Schedule and track agricultural equipment maintenance, repairs, and readiness for seasonal operations
- Trigger:
/maintain-equipmentor scheduled - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: devops-engineer, orchestrator, data-analyst
- Commands: /schedule, /monitor
- Steps:
- Equipment inspection - devops-engineer - Conduct pre-season inspections
- Maintenance scheduling - orchestrator - Plan preventive maintenance
- Parts procurement - orchestrator - Order replacement parts
- Repair execution - devops-engineer - Perform repairs and maintenance
- Readiness verification - component-qa-validator - Verify equipment operational
- Usage tracking - data-analyst - Monitor equipment hours and performance
- Documentation - codi-documentation-writer - Update maintenance logs
- Tags: [agriculture, equipment, maintenance, reliability, seasonal]
28. weather-monitoring-workflow
- Description: Monitor weather conditions, forecasts, and alerts to optimize agricultural operations and risk management
- Trigger: Automated daily
- Complexity: simple
- Duration: 1-5m
- QA Integration:
- validation: optional
- review: none
- Dependencies:
- Agents: data-analyst, orchestrator
- Commands: /monitor, /analyze
- Steps:
- Data collection - data-analyst - Gather weather data from stations and services
- Forecast analysis - data-analyst - Analyze short and long-term forecasts
- Risk assessment - orchestrator - Identify weather risks to operations
- Alert generation - orchestrator - Send alerts for critical conditions
- Decision support - project-architect - Recommend operational adjustments
- Historical tracking - data-analyst - Maintain weather history for analysis
- Tags: [agriculture, weather, monitoring, forecasting, risk]
29. soil-analysis-workflow
- Description: Collect and analyze soil samples, track soil health, and optimize fertilizer applications
- Trigger:
/analyze-soilor seasonal - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, component-qa-validator, orchestrator
- Commands: /analyze, /optimize
- Steps:
- Sample collection - orchestrator - Collect representative soil samples
- Laboratory analysis - component-qa-validator - Analyze nutrient levels and pH
- Results interpretation - data-analyst - Interpret soil test results
- Fertilizer recommendations - project-architect - Calculate fertilizer needs
- Application planning - orchestrator - Plan fertilizer application timing
- Spatial mapping - data-analyst - Create soil fertility maps
- Documentation - codi-documentation-writer - Record soil data and recommendations
- Tags: [agriculture, soil, analysis, fertility, optimization]
30. market-coordination-workflow
- Description: Track commodity prices, coordinate sales, manage contracts, and optimize marketing decisions
- Trigger:
/track-marketsor daily - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: recommended
- review: optional
- Dependencies:
- Agents: data-analyst, orchestrator
- Commands: /analyze, /track-progress
- Steps:
- Price monitoring - data-analyst - Track commodity prices and trends
- Market analysis - data-analyst - Analyze supply/demand fundamentals
- Sales planning - project-architect - Develop marketing strategy
- Contract negotiation - orchestrator - Negotiate forward contracts
- Delivery coordination - orchestrator - Schedule deliveries to buyers
- Performance tracking - data-analyst - Track marketing performance
- Tags: [agriculture, marketing, commodities, pricing, contracts]
4. Environmental & Sustainability
31. carbon-tracking-workflow
- Description: Monitor carbon emissions, track reduction initiatives, and report on carbon footprint across operations
- Trigger:
/track-carbonor monthly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: data-analyst, orchestrator, codi-documentation-writer
- Commands: /analyze, /monitor
- Steps:
- Emissions inventory - data-analyst - Collect scope 1, 2, 3 emissions data
- Calculation methodology - component-qa-validator - Apply GHG protocol standards
- Baseline establishment - orchestrator - Establish emissions baseline
- Reduction tracking - data-analyst - Monitor emissions reduction initiatives
- Offset management - orchestrator - Track carbon offset purchases
- Reporting preparation - codi-documentation-writer - Generate CDP or GRI reports
- Goal tracking - orchestrator - Monitor progress toward carbon neutrality
- Tags: [environment, carbon, emissions, sustainability, reporting]
32. waste-management-workflow
- Description: Track waste generation, optimize recycling and diversion, and reduce waste to landfill
- Trigger:
/track-wasteor weekly - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: data-analyst, orchestrator, component-qa-validator
- Commands: /analyze, /optimize
- Steps:
- Waste measurement - data-analyst - Track waste generation by type
- Diversion rate calculation - component-qa-validator - Calculate recycling and composting rates
- Waste stream analysis - data-analyst - Analyze waste composition
- Reduction opportunities - project-architect - Identify waste reduction initiatives
- Vendor management - orchestrator - Manage haulers and recyclers
- Compliance verification - security-specialist - Verify waste disposal compliance
- Reporting - codi-documentation-writer - Generate waste diversion reports
- Tags: [environment, waste, recycling, sustainability, compliance]
33. energy-monitoring-workflow
- Description: Monitor energy consumption, identify efficiency opportunities, and track renewable energy usage
- Trigger:
/monitor-energyor daily - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: optional
- Dependencies:
- Agents: devops-engineer, data-analyst, orchestrator
- Commands: /monitor, /analyze
- Steps:
- Consumption monitoring - devops-engineer - Track energy usage by facility/equipment
- Trend analysis - data-analyst - Analyze consumption patterns and trends
- Benchmark comparison - data-analyst - Compare to industry benchmarks
- Efficiency identification - project-architect - Identify energy savings opportunities
- Renewable tracking - data-analyst - Track renewable energy generation/purchases
- Cost analysis - data-analyst - Analyze energy costs and savings
- Reporting - codi-documentation-writer - Generate energy performance reports
- Tags: [environment, energy, monitoring, efficiency, renewables]
34. sustainability-reporting-workflow
- Description: Compile sustainability data, prepare ESG reports, and communicate environmental performance to stakeholders
- Trigger:
/sustainability-reportor annually - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: data-analyst, codi-documentation-writer, component-qa-validator
- Commands: /analyze, /full-review
- Steps:
- Data collection - data-analyst - Gather environmental, social, governance data
- Framework alignment - component-qa-validator - Align to GRI, SASB, or TCFD standards
- Materiality assessment - orchestrator - Identify material sustainability topics
- Goal tracking - data-analyst - Track progress toward sustainability goals
- Report drafting - codi-documentation-writer - Draft sustainability report
- Stakeholder review - component-qa-reviewer - Review with internal stakeholders
- Publication - orchestrator - Publish and communicate report
- Tags: [environment, sustainability, esg, reporting, stakeholders]
35. compliance-audit-workflow
- Description: Conduct environmental compliance audits, track permits, and ensure regulatory adherence
- Trigger:
/environmental-auditor quarterly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: security-specialist, component-qa-validator, orchestrator
- Commands: /security-scan, /audit
- Steps:
- Regulatory inventory - security-specialist - Identify applicable environmental regulations
- Permit tracking - orchestrator - Track permit status and renewals
- Compliance assessment - component-qa-validator - Evaluate compliance status
- Inspection preparation - orchestrator - Prepare for regulatory inspections
- Gap identification - component-qa-reviewer - Identify compliance gaps
- Corrective actions - orchestrator - Implement corrective measures
- Documentation - codi-documentation-writer - Maintain compliance records
- Tags: [environment, compliance, audit, regulatory, permits]
36. green-initiatives-workflow
- Description: Plan, implement, and track environmental improvement projects and green initiatives
- Trigger:
/green-initiativeor on-demand - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: project-architect, orchestrator, data-analyst
- Commands: /new-project, /track-progress
- Steps:
- Initiative planning - project-architect - Define green initiative scope and goals
- Impact assessment - data-analyst - Estimate environmental impact and ROI
- Resource allocation - orchestrator - Allocate budget and resources
- Implementation - orchestrator - Execute initiative activities
- Performance tracking - data-analyst - Monitor environmental and financial metrics
- Verification - component-qa-validator - Verify environmental benefits
- Communication - codi-documentation-writer - Share results with stakeholders
- Tags: [environment, initiatives, projects, improvement, impact]
37. recycling-program-workflow
- Description: Establish and manage recycling programs, track participation, and optimize material recovery
- Trigger:
/manage-recyclingor monthly - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, component-qa-validator
- Commands: /analyze, /optimize
- Steps:
- Program design - project-architect - Design recycling program structure
- Material tracking - data-analyst - Track recycled material volumes by type
- Participation monitoring - orchestrator - Monitor employee/customer participation
- Contamination reduction - component-qa-validator - Reduce contamination in streams
- Vendor coordination - orchestrator - Manage recycling vendors and pricing
- Revenue tracking - data-analyst - Track recycling revenue and costs
- Reporting - codi-documentation-writer - Report diversion rates and impact
- Tags: [environment, recycling, materials, sustainability, tracking]
38. environmental-impact-assessment
- Description: Assess environmental impacts of projects or operations and develop mitigation strategies
- Trigger:
/impact-assessmentor project-based - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: senior-architect, data-analyst, security-specialist
- Commands: /analyze, /full-review
- Steps:
- Scoping - senior-architect - Define assessment scope and boundaries
- Baseline characterization - data-analyst - Document existing environmental conditions
- Impact identification - orchestrator - Identify potential environmental impacts
- Significance evaluation - component-qa-validator - Evaluate impact significance
- Mitigation planning - project-architect - Develop mitigation and monitoring plans
- Regulatory review - security-specialist - Ensure regulatory compliance
- Documentation - codi-documentation-writer - Prepare EIA report
- Tags: [environment, impact, assessment, mitigation, compliance]
39. water-management-workflow
- Description: Monitor water usage, optimize consumption, track water quality, and manage wastewater
- Trigger:
/manage-wateror weekly - Complexity: moderate
- Duration: 5-15m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: devops-engineer, data-analyst, component-qa-validator
- Commands: /monitor, /analyze
- Steps:
- Usage monitoring - devops-engineer - Track water consumption by source and use
- Quality testing - component-qa-validator - Test water quality parameters
- Efficiency analysis - data-analyst - Identify water conservation opportunities
- Wastewater management - orchestrator - Manage wastewater treatment and discharge
- Compliance tracking - security-specialist - Ensure discharge permit compliance
- Cost tracking - data-analyst - Monitor water and wastewater costs
- Reporting - codi-documentation-writer - Generate water stewardship reports
- Tags: [environment, water, conservation, quality, compliance]
40. renewable-energy-workflow
- Description: Plan, implement, and monitor renewable energy projects including solar, wind, and energy storage
- Trigger:
/renewable-energyor on-demand - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: senior-architect, devops-engineer, data-analyst
- Commands: /new-project, /monitor
- Steps:
- Feasibility analysis - senior-architect - Assess renewable energy opportunities
- System design - senior-architect - Design solar/wind/storage systems
- Financial modeling - data-analyst - Calculate ROI and payback period
- Installation - devops-engineer - Coordinate system installation
- Performance monitoring - devops-engineer - Monitor energy generation
- Maintenance - devops-engineer - Maintain renewable energy systems
- Reporting - codi-documentation-writer - Track renewable energy production and savings
- Tags: [environment, renewable, energy, solar, sustainability]
5. Construction Projects
41. project-estimation-workflow
- Description: Develop comprehensive project cost estimates including materials, labor, equipment, and contingencies
- Trigger:
/estimate-projector bid-phase - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: project-architect, data-analyst, orchestrator
- Commands: /analyze, /optimize
- Steps:
- Scope analysis - project-architect - Review project plans and specifications
- Quantity takeoff - data-analyst - Calculate material quantities from drawings
- Cost database - data-analyst - Apply current material and labor rates
- Subcontractor quotes - orchestrator - Solicit and evaluate subcontractor bids
- Contingency planning - senior-architect - Add appropriate contingencies
- Estimate validation - component-qa-validator - Verify estimate completeness and accuracy
- Proposal preparation - codi-documentation-writer - Format and present estimate
- Tags: [construction, estimating, costing, bidding, planning]
42. permit-management-workflow
- Description: Manage building permits, inspections, and regulatory approvals throughout project lifecycle
- Trigger:
/manage-permitsor project-based - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, security-specialist, codi-documentation-writer
- Commands: /track-progress, /validate
- Steps:
- Permit identification - security-specialist - Identify required permits and approvals
- Application preparation - codi-documentation-writer - Prepare permit application packages
- Submission - orchestrator - Submit applications to authorities
- Status tracking - orchestrator - Monitor permit review and approval status
- Inspection scheduling - orchestrator - Schedule required inspections
- Compliance verification - component-qa-validator - Verify work meets permit conditions
- Closeout documentation - codi-documentation-writer - Obtain final approvals and occupancy
- Tags: [construction, permits, compliance, inspections, regulatory]
43. subcontractor-coordination
- Description: Manage subcontractor selection, contracts, scheduling, and performance throughout construction
- Trigger:
/coordinate-subsor ongoing - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect, component-qa-validator
- Commands: /track-progress, /schedule
- Steps:
- Subcontractor selection - orchestrator - Prequalify and select subcontractors
- Contract execution - orchestrator - Execute subcontractor agreements
- Schedule coordination - project-architect - Coordinate subcontractor schedules
- Work sequencing - project-architect - Sequence subcontractor activities
- Quality verification - component-qa-validator - Verify subcontractor work quality
- Payment processing - orchestrator - Process progress and final payments
- Performance tracking - data-analyst - Track subcontractor performance metrics
- Tags: [construction, subcontractors, coordination, scheduling, contracts]
44. material-procurement-construction
- Description: Manage construction material procurement, deliveries, and inventory to support project schedules
- Trigger:
/procure-materialsor ongoing - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, data-analyst, component-qa-validator
- Commands: /track-progress, /optimize
- Steps:
- Material planning - project-architect - Develop material procurement schedule
- Vendor selection - data-analyst - Select material suppliers
- Order placement - orchestrator - Place material purchase orders
- Delivery coordination - orchestrator - Schedule material deliveries to jobsite
- Receipt verification - component-qa-validator - Verify material quantity and quality
- Inventory management - orchestrator - Track material usage and inventory
- Cost tracking - data-analyst - Monitor material costs vs. budget
- Tags: [construction, procurement, materials, logistics, tracking]
45. site-inspection-workflow
- Description: Conduct regular site inspections for quality, safety, and progress verification
- Trigger:
/site-inspectionor scheduled - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: component-qa-validator, security-specialist, codi-documentation-writer
- Commands: /audit, /full-review
- Steps:
- Inspection planning - component-qa-validator - Define inspection scope and checklists
- Site walkthrough - component-qa-validator - Conduct physical site inspection
- Quality verification - component-qa-validator - Verify work quality against specs
- Safety assessment - security-specialist - Assess site safety conditions
- Progress documentation - orchestrator - Document work progress with photos
- Issue identification - component-qa-reviewer - Identify deficiencies and issues
- Report generation - codi-documentation-writer - Generate inspection report
- Tags: [construction, inspection, quality, safety, verification]
46. safety-compliance-construction
- Description: Implement construction safety programs, conduct training, and ensure OSHA compliance on jobsites
- Trigger:
/construction-safetyor weekly - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: security-specialist, orchestrator, codi-documentation-writer
- Commands: /security-scan, /audit
- Steps:
- Safety program development - security-specialist - Develop site-specific safety plan
- Hazard analysis - security-specialist - Conduct job hazard analyses
- Worker training - orchestrator - Conduct safety training and orientations
- Daily inspections - security-specialist - Perform daily safety inspections
- Incident investigation - component-qa-reviewer - Investigate safety incidents
- Compliance audits - component-qa-validator - Verify OSHA compliance
- Documentation - codi-documentation-writer - Maintain safety records and reports
- Tags: [construction, safety, osha, compliance, training]
47. progress-tracking-construction
- Description: Monitor construction progress, update schedules, track milestones, and report to stakeholders
- Trigger:
/track-constructionor weekly - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: recommended
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /track-progress, /analyze
- Steps:
- Progress measurement - orchestrator - Assess work completed vs. planned
- Schedule update - project-architect - Update project schedule with actuals
- Milestone tracking - orchestrator - Track milestone achievement
- Variance analysis - data-analyst - Analyze schedule and cost variances
- Forecast updates - project-architect - Update completion forecasts
- Stakeholder reporting - codi-documentation-writer - Generate progress reports
- Corrective actions - orchestrator - Implement schedule recovery if needed
- Tags: [construction, tracking, scheduling, progress, reporting]
48. change-order-management
- Description: Process construction change orders, evaluate impacts, negotiate pricing, and update project documents
- Trigger:
/change-orderor on-request - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: orchestrator, project-architect, data-analyst
- Commands: /analyze, /validate
- Steps:
- Change request - orchestrator - Document change request details
- Impact assessment - project-architect - Assess schedule and cost impacts
- Pricing development - data-analyst - Develop change order pricing
- Client review - component-qa-reviewer - Review with client for approval
- Contract modification - orchestrator - Execute change order agreement
- Document updates - codi-documentation-writer - Update drawings and specifications
- Budget tracking - data-analyst - Update project budget
- Tags: [construction, change-orders, contracts, pricing, tracking]
49. punch-list-workflow
- Description: Create punch lists, track completion of deficiency items, and ensure project closeout quality
- Trigger:
/punch-listor near-completion - Complexity: moderate
- Duration: 15-30m
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: component-qa-validator, orchestrator, component-qa-reviewer
- Commands: /track-progress, /validate
- Steps:
- Punch list creation - component-qa-validator - Identify incomplete and deficient items
- Item prioritization - component-qa-reviewer - Prioritize punch list items
- Responsibility assignment - orchestrator - Assign items to subcontractors
- Completion tracking - orchestrator - Track punch list item completion
- Verification - component-qa-validator - Verify items completed satisfactorily
- Re-inspection - component-qa-reviewer - Re-inspect completed items
- Final acceptance - orchestrator - Obtain client acceptance
- Tags: [construction, punch-list, quality, closeout, deficiencies]
50. project-closeout-workflow
- Description: Complete project closeout including final inspections, documentation, warranties, and client handover
- Trigger:
/project-closeoutor completion - Complexity: complex
- Duration: 30m+
- QA Integration:
- validation: required
- review: required
- Dependencies:
- Agents: orchestrator, codi-documentation-writer, component-qa-validator
- Commands: /full-review, /validate
- Steps:
- Final inspections - component-qa-validator - Complete all final inspections
- Punch list completion - orchestrator - Verify all punch items complete
- Documentation assembly - codi-documentation-writer - Compile as-builts, O&Ms, warranties
- Final payments - orchestrator - Process final subcontractor and supplier payments
- Client training - orchestrator - Conduct owner training on systems
- Warranty transfer - orchestrator - Transfer warranties to owner
- Project archive - codi-documentation-writer - Archive project documents
- Lessons learned - component-qa-reviewer - Document lessons learned
- Tags: [construction, closeout, handover, documentation, completion]
End of Manufacturing, Agriculture & Environment Workflows
Total Workflows: 50 (10 per category) Categories: Manufacturing Production (10), Supply Chain & Logistics (10), Agriculture & Farming (10), Environmental & Sustainability (10), Construction Projects (10) Complexity Distribution: Simple (2), Moderate (30), Complex (18) QA Integration: All H.P.006-WORKFLOWS include validation and/or review requirements appropriate to their risk level