Project Status Brief (Auto-Generated)

Generated: 2026-02-17T03:10:35.087Z Project: coditect-biosciences-qms-platform

Summary

  • Overall: 33% (137/410 tasks)
  • Tracks: 17 total | 1 active | 0 in-progress | 12 planned | 4 complete
  • Sections: 87 total | 23 complete | 0 in-progress | 64 pending
  • Velocity: 45.7 tasks/day | high trend | ~6 days remaining | 3 active work days

Tracks

TrackNameStatusProgressSectionsSprint
APresentation & Publishingcomplete100% (34/34)6C/0P/0WS1-S3
BCompetitive Intelligence & GTMcomplete100% (28/28)5C/0P/0WS2-S3
CTechnical Foundationcomplete100% (42/42)5C/0P/0WS3-S6
DCompliance & Securitycomplete100% (33/33)7C/0P/0WS3-S6
EOperations & Deploymentplanned0% (0/20)0C/0P/5WS5-S6
FDocumentation & Trainingactive0% (0/24)0C/0P/6WS3+
GRevenue & Billing Operationsplanned0% (0/24)0C/0P/5WS5-S7
HCustomer Operationsplanned0% (0/24)0C/0P/5WS5-S8
ISales & Business Developmentplanned0% (0/20)0C/0P/5WS4-S7
JProduct Management & Analyticsplanned0% (0/22)0C/0P/5WS6-S8
KPlatform Reliability & Maintenanceplanned0% (0/24)0C/0P/6WS6-S9
LData & Business Intelligenceplanned0% (0/22)0C/0P/5WS7-S9
MSecurity Operationsplanned0% (0/18)0C/0P/5WS6-S9
NLegal & Regulatory Operationsplanned0% (0/26)0C/0P/5WS5-S8
OPartner Ecosystemplanned0% (0/19)0C/0P/4WS8-S10
PAccessibility & Internationalizationplanned0% (0/18)0C/0P/5WS4-S10
QAI & Automation Governanceplanned0% (0/12)0C/0P/3WS8-S10

At-Risk Tracks (0% Progress)

  • E Operations & Deployment: 20 tasks, status=planned, sprint=S5-S6
  • F Documentation & Training: 24 tasks, status=active, sprint=S3+
  • G Revenue & Billing Operations: 24 tasks, status=planned, sprint=S5-S7
  • H Customer Operations: 24 tasks, status=planned, sprint=S5-S8
  • I Sales & Business Development: 20 tasks, status=planned, sprint=S4-S7
  • J Product Management & Analytics: 22 tasks, status=planned, sprint=S6-S8
  • K Platform Reliability & Maintenance: 24 tasks, status=planned, sprint=S6-S9
  • L Data & Business Intelligence: 22 tasks, status=planned, sprint=S7-S9
  • M Security Operations: 18 tasks, status=planned, sprint=S6-S9
  • N Legal & Regulatory Operations: 26 tasks, status=planned, sprint=S5-S8
  • O Partner Ecosystem: 19 tasks, status=planned, sprint=S8-S10
  • P Accessibility & Internationalization: 18 tasks, status=planned, sprint=S4-S10
  • Q AI & Automation Governance: 12 tasks, status=planned, sprint=S8-S10

Cross-Track Dependencies

  • Viewer foundation: A.1 → A.2, A.3, P.1 (Markdown rendering before nav/search/a11y)
  • Cloud platform: A.4 → A.5 (Deploy before auth)
  • Competitive data: B.1 → B.2, I.2 (Market analysis before GTM and sales collateral)
  • Backend scaffold: C.1 → C.2-C.5, G.1, H.1-H.2, J.1, N.2 (API framework before all backend features)
  • State machine: C.2 → J.3 (WO engine before WO analytics)
  • Integrations: C.5 → O.2, O.3 (Integration layer before marketplace/SDK)
  • Crypto foundation: D.1 → C.4, M.4 (Gap closure before e-sig and secrets mgmt)
  • HIPAA controls: D.3 → N.2, N.3 (HIPAA before GDPR engine and BAA management)
  • CI/CD pipeline: E.1 → M.1, K.3 (Pipeline before security scanning and patching)
  • Infrastructure: E.2 → K.1, L.1, P.4 (GCP before SLA monitoring, data warehouse, regions)
  • Monitoring: E.3 → K.1-K.2, M.3 (Observability before SLA/incident management)
  • Subscriptions: G.1 → G.2-G.5, H.3 (Subscription model before pricing/billing/health)
  • Payments: G.3 → H.4, I.4 (Payment processing before billing portal/contracts)
  • CRM: I.1 → I.3-I.5, H.3 (CRM before assessment tool, proposals, partner mgmt)
  • Telemetry: J.1 → J.2-J.4 (Event tracking before analytics/experimentation)
  • Partner program: I.5, O.1 → O.2-O.4 (Foundation before marketplace/SDK/analytics)
  • i18n framework: P.2 → P.3, P.4 (i18n before localization and regional data)
  • AI governance: Q.1 → Q.2-Q.3 (Model governance before AI testing/risk mgmt)
  • Agent framework: C.3 → Q.1 (Agent orchestration before AI governance)
  • Data warehouse: L.1 → Q.2 (Warehouse before AI model monitoring data)
  • Validation: D.7 → Q.2 (Validation framework before AI validation)
  • Tenant lifecycle: D.6 → H.1, G.1 (Tenant provisioning before onboarding/billing)
  • DR automation: E.5 → K.5 (DR validation before chaos engineering)
  • Training records: F.6 → D.2 (Training records for Part 11 compliance)
  • Multi-site: K.6 → O.1 (Site management before partner coordination)
  • All tracks: * → F.* (Documentation continuous across all work)

Sprint Load

  • S1 (Wk 1-2): Presentation + Doc Verification — 7 sections
  • S2 (Wk 3-4): Cloud Publishing + Competitive Analysis — 5 sections
  • S3 (Wk 5-6): Auth + GTM + Foundation Start — 8 sections
  • S4 (Wk 7-8): Backend Core + Sales Enablement — 7 sections
  • S5 (Wk 9-10): Agents + Integrations + Billing — 9 sections
  • S6 (Wk 11-12): Ops + Payments + Data Warehouse — 16 sections
  • S7 (Wk 13-14): Analytics + Monitoring + Reliability — 26 sections
  • S8 (Wk 15-16): Docs + BI + Marketplace + AI Governance — 24 sections
  • S9 (Wk 17-18): Patching + Resilience + Vulnerability — 10 sections
  • S10 (Wk 19-20): Final Polish — 24 sections

Agent Workload

  • frontend-react-typescript-expert: 1 tracks
  • competitive-analyst: 1 tracks
  • senior-architect: 1 tracks
  • security-specialist: 1 tracks
  • devops-engineer: 1 tracks
  • codi-documentation-writer: 1 tracks
  • payment-systems-specialist: 1 tracks
  • customer-onboarding: 1 tracks
  • sales-workflow: 1 tracks
  • product-analytics-specialist: 1 tracks
  • sre-on-call-assistant: 1 tracks
  • data-pipeline-specialist: 1 tracks
  • incident-response-specialist: 1 tracks
  • regulatory-change-monitor: 1 tracks
  • partner-onboarding: 1 tracks
  • accessibility-testing-specialist: 1 tracks
  • responsible-ai: 1 tracks

Recent Session Logs

  • 2026-02-16 — BIO-QMS
  • 2026-02-15 — BIO-QMS
  • 2026-02-14 — BIO-QMS

Completed Work (Active Tracks)

A: Presentation & Publishing (34 done)

  • A.1.1: Install unified/remark/rehype markdown pipeline
  • A.1.2: Create MarkdownRenderer.jsx component with frontmatter extraction
  • A.1.3: Build publish.json manifest generator from docs/ directory tree
  • A.1.4: Extend viewer.jsx to route markdown docs alongside JSX dashboards
  • A.1.5: Implement hash-based URL routing (/#/audience/category/document)
  • A.1.6: Add print-friendly CSS and document metadata display
  • A.2.1: Integrate MiniSearch for client-side full-text search
  • A.2.2: Build search index from all markdown content at build time
  • A.2.3: Create sidebar navigation tree from publish.json categories
  • A.2.4: Add breadcrumb navigation and document table of contents
  • A.2.5: Implement keyboard shortcuts (/, Ctrl+K for search)
  • A.3.1: Fullscreen presentation mode with minimal chrome
  • A.3.2: Keyboard navigation (arrows for prev/next, Escape to exit)
  • A.3.3: Section-by-section slide progression within documents
  • A.3.4: Presentation timer and progress indicator
  • A.4.1: Create publish.json schema and validation
  • A.4.2: Build static site generator from Vite configuration
  • A.4.3: Create Cloud Run deployment configuration
  • A.4.4: Implement environment-based auth mode switching
  • A.4.5: Create deployment script (scripts/deploy.sh)
  • A.4.6: Implement CDN caching with Cloud CDN
  • A.4.7: Add custom domain and SSL configuration
  • A.4.8: Create publish CLI command for one-click deployment
  • A.5.1: Implement NDARecord Django model in auth.coditect.ai
  • A.5.2: Implement DocumentViewToken Django model
  • A.5.3: Create NDA verification API endpoints
  • A.5.4: Implement client-side auth flow in viewer
  • A.5.5: Build audit trail for document access
  • A.5.6: Implement token revocation and admin controls
  • A.5.7: Create local bypass mode for development/presentations
  • A.6.1: Extract viewer core into @coditect/doc-viewer npm package
  • A.6.2: Create project scaffolding CLI
  • A.6.3: Publish to npm with semantic versioning
  • A.6.4: Create customer onboarding documentation

B: Competitive Intelligence & GTM (28 done)

  • B.0.1: Audit all TRACK-referenced documents for existence
  • B.0.2: Create or update missing referenced documents
  • B.0.3: Verify document cross-references are bidirectional
  • B.0.4: Create document readiness gate for sprint start
  • B.1.1: Execute Phase 1 Turn 1 — Market sizing (TAM/SAM/SOM)
  • B.1.2: Execute Phase 1 Turn 2 — Customer segmentation & ICP
  • B.1.3: Execute Phase 2 Turn 3 — Competitor profiling
  • B.1.4: Execute Phase 2 Turn 4 — Moat & positioning
  • B.1.5: Execute Phase 3 Turn 5 — Synthesis
  • B.1.6: Update existing artifacts (05-10) with new competitive data
  • B.1.7: Regenerate competitive-comparison dashboard (54.jsx)
  • B.2.1: Execute Turn 1 — GTM model & revenue architecture
  • B.2.2: Execute Turn 2 — Channel strategy & sales process
  • B.2.3: Execute Turn 3 — Demand gen & content strategy
  • B.2.4: Execute Turn 4 — Customer success & expansion
  • B.2.5: Execute Turn 5 — Phased launch plan
  • B.2.6: Execute Turn 6 — Metrics & dashboards
  • B.2.7: Update 09-go-to-market-strategy.md
  • B.2.8: Update 62-unified-execution-plan.md with GTM phases
  • B.3.1: Execute impact register generation
  • B.3.2: Identify cascade update requirements
  • B.3.3: Generate impact visualization dashboard
  • B.4.1: Audit existing market docs (05-10) against new analysis
  • B.4.2: Update executive summary (01-executive-summary.md)
  • B.4.3: Update investment thesis (02-executive-summary-updated.md)
  • B.4.4: Update financial projections (03-business-case.md)
  • B.4.5: Update document inventory (30-document-inventory.md)
  • B.4.6: Regenerate publish.json manifest with new artifacts

C: Technical Foundation (42 done)

  • C.1.1: Initialize NestJS project with TypeScript strict mode
  • C.1.2: Configure Prisma ORM with PostgreSQL schema
  • C.1.3: Implement authentication module (JWT + OAuth2)
  • C.1.4: Implement RBAC authorization system
  • C.1.5: Create base CRUD module with audit trail
  • C.1.6: Set up database migrations and seeding
  • C.1.7: Configure OpenAPI/Swagger documentation
  • C.1.8: Set up testing framework (unit + integration)
  • C.2.1: Implement XState workflow engine core (80/80 tests pass, 5 suites)
  • C.2.2: Define CAPA state machine (54/54 tests pass)
  • C.2.3: Define Deviation state machine (44/44 tests pass)
  • C.2.4: Define Change Control state machine (50/50 tests pass, 196/196 full regression)
  • C.2.5: Implement state transition API endpoints (239/239 tests pass)
  • C.2.6: Add state machine visualization endpoint (264/264 tests pass)
  • C.2.7: Implement change control regulatory classification (284/284 tests pass, 70 change control tests)
  • C.2.8: Build deviation-to-change linking (306/306 tests pass, 22 cross-entity linking tests)
  • C.2.9: Implement change effectiveness verification workflow ✅ 336/336 tests, 30 new
  • C.2.10: Create change communication engine ✅ 360/360 tests, 24 new
  • C.2.11: Design rollback testing per change type ✅ 386/386 tests, 26 new
  • C.3.1: Implement agent execution engine ✅ 2026-02-15
  • C.3.2: Create Document Analysis Agent ✅ 2026-02-15
  • C.3.3: Create CAPA Investigation Agent ✅ 2026-02-15
  • C.3.4: Create Compliance Monitoring Agent ✅ 2026-02-15
  • C.3.5: Implement agent API and scheduling ✅ 2026-02-15
  • C.3.6: Implement tenant-scoped context isolation ✅ 2026-02-15
  • C.3.7: Build agent decision audit trail ✅ 2026-02-15
  • C.3.8: Create coditect-core registry components for BIO-QMS agents ✅ 2026-02-15
  • C.4.1: Implement cryptographic signing module
  • C.4.2: Create electronic signature service
  • C.4.3: Implement document integrity verification
  • C.4.4: Create timestamping authority integration
  • C.4.5: Build signature verification UI components
  • C.5.1: Implement webhook event system
  • C.5.2: Create ERP integration adapter
  • C.5.3: Create LIMS integration adapter
  • C.5.4: Create document management integration
  • C.5.5: Implement API rate limiting and quotas
  • C.5.6: Create integration testing suite
  • C.5.7: Implement HL7 FHIR data exchange
  • C.5.8: Build batch record traceability — 57 tests pass, 1067/1067 full regression
  • C.5.9: Create Electronic Batch Record (EBR) generation — 41 tests pass, 1108/1108 full regression
  • C.5.10: Implement quality hold automation — 35 tests pass, 1143/1143 full regression

D: Compliance & Security (33 done)

  • D.1.1: Define cryptographic algorithm selection and key management policy
  • D.1.2: Design HSM integration architecture for production key management
  • D.1.3: Implement certificate chain for document signing
  • D.1.4: Create validation test suite for cryptographic operations
  • D.2.1: Create IQ/OQ/PQ validation protocol documents
  • D.2.2: Implement electronic record controls
  • D.2.3: Implement electronic signature controls
  • D.2.4: Create validation execution evidence package
  • D.2.5: Conduct validation review and approval
  • D.3.1: Implement access controls for PHI data
  • D.3.2: Implement encryption for PHI at rest and in transit
  • D.3.3: Build BAA (Business Associate Agreement) management module
  • D.3.4: Create HIPAA audit and reporting capabilities
  • D.4.1: Map SOC 2 Trust Service Criteria to system controls
  • D.4.2: Implement continuous monitoring controls
  • D.4.3: Create SOC 2 evidence collection automation
  • D.4.4: Prepare SOC 2 readiness assessment
  • D.5.1: Implement immutable audit trail storage
  • D.5.2: Create audit trail search and reporting API
  • D.5.3: Build compliance dashboard for ongoing monitoring
  • D.5.4: Package regulatory submission documentation
  • D.5.5: Implement ALCOA+ format preservation controls
  • D.5.6: Build original/copy/amendment tracking system
  • D.5.7: Create accuracy monitoring dashboard
  • D.5.8: Implement legibility controls for long-term storage
  • D.6.1: Implement per-tenant encryption key management
  • D.6.2: Build automated tenant provisioning workflow
  • D.6.3: Create tenant deletion and data purge workflow
  • D.6.4: Implement tenant data export and migration
  • D.7.1: Build validation test execution framework
  • D.7.2: Create validation approval and sign-off workflow
  • D.7.3: Implement validation binder assembly automation
  • D.7.4: Build periodic re-validation scheduling

Next Up (Pending Tasks in Active Tracks)

F: Documentation & Training (24 remaining)

  • F.1.1: Create Getting Started guide
  • F.1.2: Create Document Management user guide
  • F.1.3: Create CAPA Management user guide
  • F.1.4: Create Deviation Management user guide
  • F.1.5: Create Search & Reporting user guide
  • ... and 19 more

Section Detail (Active Tracks)

A: Presentation & Publishing

  • [DONE] A.1 Viewer Enhancement — Markdown Rendering (6/6)
  • [DONE] A.2 Navigation & Search (5/5)
  • [DONE] A.3 Presentation Mode (4/4)
  • [DONE] A.4 Cloud Publishing Platform (ADR-195) (8/8)
  • [DONE] A.5 NDA-Gated Access Control (ADR-196) (7/7)
  • [DONE] A.6 Multi-Project Reusable Package (4/4)

B: Competitive Intelligence & GTM

  • [DONE] B.0 Pre-Sprint Document Verification (4/4)
  • [DONE] B.1 Competitive Market Analysis (Prompt 76) (7/7)
  • [DONE] B.2 GTM Strategy Generation (Prompt 77) (8/8)
  • [DONE] B.3 Cross-Artifact Impact Register (Prompt 78) (3/3)
  • [DONE] B.4 Artifact Reconciliation & Update (6/6)

C: Technical Foundation

  • [DONE] C.1 Backend API Scaffold (NestJS/Prisma) (8/8)
  • [DONE] C.2 State Machine Engine Implementation (11/11)
  • [DONE] C.3 Agent Orchestration Framework (8/8)
  • [DONE] C.4 E-Signature & Crypto Foundation (5/5)
  • [DONE] C.5 Integration & API Layer (10/10)

D: Compliance & Security

  • [DONE] D.1 Critical Gap Closure (Crypto/Signatures) (4/4)
  • [DONE] D.2 FDA 21 CFR Part 11 Validation (5/5)
  • [DONE] D.3 HIPAA Security Controls (4/4)
  • [DONE] D.4 SOC 2 Compliance Implementation (4/4)
  • [DONE] D.5 Audit Trail & Evidence Package (8/8)
  • [DONE] D.6 Multi-Tenancy & Tenant Lifecycle (4/4)
  • [DONE] D.7 Validation Execution & Management (4/4)

F: Documentation & Training

  • [TODO] F.1 User Documentation (0/5)
  • [TODO] F.2 API Documentation (0/4)
  • [TODO] F.3 Admin & Compliance Docs (0/4)
  • [TODO] F.4 Training Materials (0/5)
  • [TODO] F.5 Document Inventory Updates (0/2)
  • [TODO] F.6 Training Record Management & Qualification (0/4)

Recent Work (Session Log Excerpts)

2026-02-16:

  • 2026-02-16T09:20:47Z — [D.1-D.7] Track D: Compliance & Security — Session Completion Summary
  • 2026-02-16T10:35:08Z — [A.4.1-A.4.8] Track A.4: Cloud Publishing Platform — Session Start
  • 2026-02-16T15:30:00Z — [ADR-196] NDARecord Django Model Technical Design Document
  • 2026-02-16T11:10:52Z — [A.4.1-A.4.8, A.5.1-A.5.7] Track A Sections A.4 + A.5 Complete
  • 2026-02-16T11:14:20Z — [A.6] Track A.6: Multi-Project Reusable Package — START
  • 2026-02-16T11:30:00Z — [A.6.1-A.6.4] Track A Complete — 100% (34/34 tasks)
  • 2026-02-16T11:35:00Z — [E.1-E.5] Track E: Operations & Deployment — START
  • 2026-02-16T18:02:00Z — [J.18] Dashboard Consolidation — BIO-QMS becomes consumer 2026-02-15:
  • 2026-02-15T10:45:00Z — [C.4.1-C.4.5] E-Signature & Crypto Foundation Complete
  • 2026-02-15T10:50:00Z — [C.5] Session Start: Integration & API Layer
  • 2026-02-15T11:30:00Z — [C.5.1] Webhook Event System Complete
  • 2026-02-15T16:46:21Z — [C.5.2] ERP Integration Adapter Complete + API Research
  • 2026-02-15T09:45:00Z — [C.5.3] LIMS Integration Adapter — Complete
  • 2026-02-15T21:45:00Z — [C.5.4] Document Management Integration Complete
  • 2026-02-15T10:45:00Z — [C.5.5] API Rate Limiting & Quotas Complete
  • 2026-02-15T19:04:28Z — [H.0] Project Status Updated + Velocity Dashboard Bug Fix