│ CRITICAL PATH (10-12 days) │
└─────────────────────────────────────────────────────────────────────────┘

Infrastructure (✅ Complete)

├─► API Contract Design (Day 1, 2h) ───────────────────┐
│ │
├─► Cloud KMS Deploy (Day 1-2, 4h total) │
│ │ │
│ └─► KMS Integration (Day 4, 3h) ──┐ │
│ │ │
├─► Identity Platform (Day 1-2, 6h total) │ │
│ │ │ │
│ └─► JWT Validation (Day 5, 4h) ───┤ │
│ │ │
└────────────────────────────────────────┐ │ │
│ │ │
FastAPI Setup (Day 1, 3h) ◄──────────────────┘ │ │
│ │ │
└─► Database Models (Day 2, 4h) │ │
│ │ │
└─► License Endpoints (Day 3-4, 7h)│ │
│ │ │
│ ◄─────────────────────────┘ │
│ │
└─► Comprehensive Tests (Day 5, 4h) ◄───┘

└─► Backend Complete Tag (Day 5)

├─► Dockerfile Build (Day 6, 2h)
│ │
│ └─► Deploy to GKE (Day 7, 4h)
│ │
│ └─► E2E Tests (Day 7, 1h)
│ │
│ └─► Client SDK (Day 9-10, 8h)
│ │
│ └─► MVP Complete ✅

└─► (Parallel) K8s Manifests (Day 3-4, 7h)

└─► CI/CD Pipeline (Day 5-6, 6h)

Critical Path Duration: 10-12 days Longest Sequential Chain:

  1. Infrastructure (✅)
  2. API Contract (2h)
  3. FastAPI Setup (3h)
  4. Database Models (4h)
  5. License Endpoints (7h) - waits for KMS + Identity Platform
  6. JWT Validation (4h)
  7. Comprehensive Tests (4h)
  8. Deploy to GKE (4h)
  9. E2E Tests (1h)
  10. Client SDK (8h)

Total Critical Path: ~37 hours of sequential work = 5 days minimum (with 8-hour days) With Buffer (testing, debugging, coordination): 10-12 days realistic


Full Dependency Graph (All Tasks)

Phase 1: Security Services (Days 1-2)

Infrastructure Deployed ✅

├─────────────────────────────────────────┐
│ │
▼ ▼
[P1-T01] [P1-T02]
Cloud KMS Module Identity Platform Module
(Day 1, 3h) (Day 1, 4h)
│ │
▼ ▼
[P1-T01b] [P1-T02b]
Deploy Cloud KMS Deploy Identity Platform
(Day 2, 1h) (Day 2, 2h)
│ │
├─────────────────────────────────────────┤
│ │
▼ ▼
[P1-T03] Security Hardening (Day 2, 2h)


[P1-T04] Security Audit (Day 3, 3h)

DEPENDENCIES:
- P1-T01 → P1-T01b (module before deployment)
- P1-T02 → P1-T02b (module before deployment)
- P1-T01b + P1-T02b → P1-T03 (both deployed before hardening)
- P1-T03 → P1-T04 (hardening before audit)

PARALLEL:
- P1-T01 || P1-T02 (both can start Day 1)
- P1-T01b || P1-T02b (both deploy Day 2)

Phase 2: Backend Development (Days 1-5)

Infrastructure Deployed ✅


[P2-T01] FastAPI Project Setup (Day 1, 3h)

├────────────────────────────────┐
│ │
▼ ▼
[P2-T02] [P2-T03]
Database Models API Contract Design
(Day 2, 4h) (Day 1, 2h) ◄── Checkpoint 1
│ │
▼ │
[P2-T02b] │
Model Tests │
(Day 2, 2h) │
│ │
├────────────────────────────────┘

├──────────────────────────┬──────────────────┐
│ │ │
│ │ │
│ [P1-T01b] [P1-T02b]
│ Cloud KMS Identity Platform
│ (Day 2, 1h) (Day 2, 2h)
│ │ │
│ │ │
▼ ▼ │
[P2-T04a] [P2-T06] │
License Acquire Redis Lua Scripts │
(Day 3, 3h) (Day 4, 3h) │
│ │ │
▼ ▼ │
[P2-T04b] [P2-T07] │
Heartbeat KMS Integration │
(Day 3, 2h) (Day 4, 3h) │
│ │ │
▼ │ │
[P2-T04c] │ │
Release │ │
(Day 4, 2h) │ │
│ │ │
├──────────────────────────┤ │
│ │ │
│ ▼ ▼
│ [P2-T08]
│ JWT Validation
│ (Day 5, 4h)
│ │
│ │
├──────────────────────────┘


[P2-T09] Comprehensive Tests (Day 5, 4h)


[P2-T10] Backend Complete Tag ◄── Checkpoint 3

DEPENDENCIES:
- P2-T01 → P2-T02, P2-T03 (setup before models/contract)
- P2-T02 + P2-T02b → P2-T04a/b/c (models tested before endpoints)
- P2-T04a/b/c + P1-T01b → P2-T06, P2-T07 (endpoints + KMS for Redis/signing)
- P2-T04a/b/c + P1-T02b → P2-T08 (endpoints + Identity for JWT)
- P2-T04a/b/c + P2-T06 + P2-T07 + P2-T08 → P2-T09 (all code before tests)
- P2-T09 → P2-T10 (tests pass before tagging complete)

PARALLEL:
- P2-T01 || P1-T01 || P1-T02 (Day 1 kickoff)
- P2-T04a || P2-T04b (Day 3, two endpoints)
- P2-T06 || P2-T07 (Day 4, Redis + KMS integration)

Phase 3: Deployment (Days 1-7)

Infrastructure Deployed ✅

├────────────────────────────────────┐
│ │
▼ ▼
[P3-T01] [P3-T02]
Dockerfile Skeleton K8s Base Manifests
(Day 1, 2h) (Day 3, 4h)
│ │
▼ ▼
[P3-T01b] [P3-T02b]
Multi-stage Dockerfile Service + Ingress
(Day 2, 3h) (Day 4, 3h)
│ │
│ ▼
│ [P3-T03]
│ K8s ConfigMaps + Secrets
│ (Day 3, 3h) ◄── Checkpoint 2
│ │
│ │
│ [P2-T10] │
│ Backend Complete │
│ (Day 5) │
│ │ │
├──────────────┤ │
│ │ │
▼ ▼ ▼
[P3-T04] [P3-T05] [P3-T06]
Local CI/CD GitHub Actions
Docker Workflow Image Build
Test (Day 5, 4h) (Day 6, 2h)
(Day 6, 1h) │ │
│ └────────────────────┤
│ │
│ ▼
│ [P3-T07]
│ Deploy Script
│ (Day 6, 3h)
│ │
│ ▼
│ [P3-T08]
│ E2E Smoke Tests
│ (Day 6, 3h)
│ │
└───────────────────────────────────┤


[P3-T09]
Deploy to GKE ◄── Checkpoint 4
(Day 7, 4h)


Production Ready ✅

DEPENDENCIES:
- Infrastructure → P3-T01, P3-T02 (infra ready for Docker/K8s)
- P3-T01 → P3-T01b (skeleton before multi-stage)
- P3-T02 → P3-T02b, P3-T03 (base before service/configmaps)
- P2-T10 + P3-T01b → P3-T04 (backend + Dockerfile for local test)
- P2-T10 + P3-T02b + P3-T03 → P3-T05 (backend + K8s for CI/CD)
- P3-T05 → P3-T06, P3-T07 (CI/CD before build/deploy)
- P3-T06 + P3-T07 → P3-T08 (build + deploy before E2E)
- P3-T04 + P3-T08 → P3-T09 (local test + E2E before production)

PARALLEL:
- P3-T01 || P3-T02 (Day 1-3, Dockerfile + K8s develop independently)
- P3-T06 || P3-T07 || P3-T08 (Day 6, build + deploy + test scripts)

Phase 4: Client SDK (Days 9-10)

[P3-T09] Production Deployed ✅


[P4-T01] Python SDK Structure (Day 9, 3h)


[P4-T02] License Client Implementation (Day 9, 4h)

├────────────────────────────────┐
│ │
▼ ▼
[P4-T03] [P4-T04]
Offline Mode SDK Tests
(Day 9, 2h) (Day 10, 3h)
│ │
└────────────────────────────────┤


[P4-T05]
Publish SDK
(Day 10, 1h)


[P4-T06]
Integrate with coditect-core ◄── Checkpoint 5
(Day 10, 2h)


MVP Complete ✅

DEPENDENCIES:
- P3-T09 → P4-T01 (production API before SDK development)
- P4-T01 → P4-T02 (structure before implementation)
- P4-T02 → P4-T03, P4-T04 (implementation before offline/tests)
- P4-T03 + P4-T04 → P4-T05 (offline + tests pass before publish)
- P4-T05 → P4-T06 (published before integration)

PARALLEL:
- P4-T03 || P4-T04 (Day 9-10, offline mode + tests develop independently)

Parallelization Opportunities Matrix

TaskDepends OnCan Run Parallel WithStreamAgent
Phase 1
Cloud KMS ModuleInfrastructure ✅Identity Platform, FastAPI Setup, Dockerfile, K8sInfrastructurecloud-architect
Identity Platform ModuleInfrastructure ✅Cloud KMS, FastAPI Setup, Dockerfile, K8sInfrastructurecloud-architect
Deploy Cloud KMSCloud KMS ModuleDeploy Identity Platform, Database Models, DockerfileInfrastructurecloud-architect
Deploy Identity PlatformIdentity Platform ModuleDeploy Cloud KMS, Database Models, DockerfileInfrastructurecloud-architect
Security HardeningCloud KMS + Identity DeployedDatabase Models, K8s ManifestsInfrastructuresecurity-specialist
Security AuditSecurity HardeningLicense Endpoints, K8s ManifestsInfrastructuresecurity-specialist
Phase 2
FastAPI SetupNoneCloud KMS, Identity Platform, Dockerfile, K8sBackendcodi-code-architect
API Contract DesignFastAPI SetupCloud KMS, Identity PlatformBackendcodi-code-architect
Database ModelsFastAPI SetupCloud KMS, Identity Platform, Dockerfile, K8sBackendcodi-code-architect
Model TestsDatabase ModelsCloud KMS, Identity Platform, Dockerfile, K8sBackendcodi-code-architect
License AcquireModels + TestsHeartbeat, Redis Lua, K8s ManifestsBackendcodi-code-architect
HeartbeatModels + TestsLicense Acquire, Redis Lua, K8s ManifestsBackendcodi-code-architect
ReleaseModels + TestsRedis Lua, KMS Integration, K8s ManifestsBackendcodi-code-architect
Redis Lua ScriptsLicense EndpointsKMS Integration, JWT Validation, K8s ManifestsBackendcodi-code-architect
KMS IntegrationRedis Lua + Cloud KMS DeployedJWT Validation, K8s ManifestsBackendcodi-code-architect
JWT ValidationLicense Endpoints + Identity DeployedComprehensive TestsBackendcodi-code-architect
Comprehensive TestsAll Backend CodeDockerfile Build, CI/CD WorkflowBackendcodi-code-architect
Phase 3
Dockerfile SkeletonNoneFastAPI Setup, Cloud KMS, Identity Platform, K8sDeploymentcodi-devops-engineer
Multi-stage DockerfileDockerfile SkeletonDatabase Models, K8s ManifestsDeploymentcodi-devops-engineer
K8s Base ManifestsInfrastructure ✅FastAPI Setup, Database Models, DockerfileDeploymentcodi-devops-engineer
Service + IngressK8s Base ManifestsLicense Endpoints, DockerfileDeploymentcodi-devops-engineer
K8s ConfigMaps + SecretsK8s Base Manifests + Cloud KMS/Identity DeployedLicense Endpoints, DockerfileDeploymentcodi-devops-engineer
CI/CD WorkflowBackend Complete + K8s ManifestsLocal Docker TestDeploymentcodi-devops-engineer
Image Build AutomationCI/CD WorkflowDeploy Script, E2E TestsDeploymentcodi-devops-engineer
Deploy ScriptCI/CD WorkflowImage Build, E2E TestsDeploymentcodi-devops-engineer
E2E Smoke TestsCI/CD WorkflowImage Build, Deploy ScriptDeploymentcodi-devops-engineer
Deploy to GKEAll Deployment Tasks + Backend CompleteNone (critical path)Deploymentcodi-devops-engineer
Phase 4
SDK StructureProduction DeployedNoneBackendcodi-code-architect
SDK ImplementationSDK StructureNoneBackendcodi-code-architect
Offline ModeSDK ImplementationSDK TestsBackendcodi-code-architect
SDK TestsSDK ImplementationOffline ModeBackendcodi-code-architect
Publish SDKOffline Mode + SDK TestsNoneBackendcodi-code-architect
Integrate with coditect-corePublish SDKNoneBackendcodi-code-architect

Gantt Chart (Text-Based)

CODITECT Cloud Platform - Parallel Execution Timeline
=============================================================================

Day 1: Setup + API Contract
─────────────────────────────────────────────────────────────────────────────
Infrastructure │████████ Cloud KMS Module (3h)
│████████████ Identity Platform Module (4h)

Backend │████████ FastAPI Setup (3h)
│█████ API Contract Design (2h) ◄── CHECKPOINT 1

Deployment │█████ Dockerfile Skeleton (2h)

Documentation │█████ Architecture Docs (2h)

─────────────────────────────────────────────────────────────────────────────

Day 2: Phase 1 Complete + Phase 2 Models
─────────────────────────────────────────────────────────────────────────────
Infrastructure │███ Deploy Cloud KMS (1h)
│██████ Deploy Identity Platform (2h)
│██████ Security Hardening (2h)

Backend │████████████ Database Models (4h)
│██████ Model Tests (2h)

Deployment │█████████ Multi-stage Dockerfile (3h)

Documentation │██████ Security Architecture (2h)

─────────────────────────────────────────────────────────────────────────────

Day 3: K8s Configs + Backend Endpoints Start
─────────────────────────────────────────────────────────────────────────────
Infrastructure │█████████ K8s ConfigMaps + Secrets (3h) ◄── CHECKPOINT 2
│█████████ Security Audit (3h)

Backend │█████████ License Acquire (3h)
│██████ Heartbeat (2h)

Deployment │████████████ K8s Manifests (4h)

Documentation │███ API Docs Auto-Gen (1h)

─────────────────────────────────────────────────────────────────────────────

Day 4: Backend Endpoints + Redis + KMS Integration
─────────────────────────────────────────────────────────────────────────────
Infrastructure │⏸️ Standby

Backend │██████ Release Endpoint (2h)
│█████████ Redis Lua Scripts (3h)
│█████████ Cloud KMS Integration (3h)

Deployment │█████████ Service + Ingress Configs (3h)

Documentation │██████ Integration Guide (2h)

─────────────────────────────────────────────────────────────────────────────

Day 5: Backend Complete + CI/CD
─────────────────────────────────────────────────────────────────────────────
Infrastructure │⏸️ Standby

Backend │████████████ JWT Validation (4h)
│████████████ Comprehensive Tests (4h) ◄── CHECKPOINT 3

Deployment │████████████ GitHub Actions Workflow (4h)

Documentation │█████████ Deployment Runbook (3h)

─────────────────────────────────────────────────────────────────────────────

Day 6: CI/CD Complete + Pre-Deploy Validation
─────────────────────────────────────────────────────────────────────────────
Infrastructure │⏸️ Standby

Backend │██████ Bug Fixes from Testing (2h)

Deployment │██████ Image Build Automation (2h)
│█████████ Deploy Script (3h)
│█████████ E2E Smoke Tests (3h)

Documentation │██████ Troubleshooting Guide (2h)

─────────────────────────────────────────────────────────────────────────────

Day 7: CHECKPOINT 4 - Deploy to GKE ⚠️ CRITICAL
─────────────────────────────────────────────────────────────────────────────
ALL STREAMS │██ Infrastructure Verification (30m)
│███ Deploy to GKE (1h)
│███ E2E Smoke Tests (1h)
│██ Log Monitoring (30m)
│███ Security Validation (1h)
│██ Update Documentation (30m)

│ ✅ PRODUCTION DEPLOYED
─────────────────────────────────────────────────────────────────────────────

Day 8: Production Hardening + Monitoring
─────────────────────────────────────────────────────────────────────────────
Infrastructure │████████████ Prometheus + Grafana Dashboards (4h)

Backend │█████████ Performance Optimization (3h)

Deployment │█████████ Alerting Rules (3h)

Documentation │██████ Runbook Finalization (2h)

─────────────────────────────────────────────────────────────────────────────

Day 9: Client SDK Development
─────────────────────────────────────────────────────────────────────────────
Backend │█████████ SDK Structure (3h)
│████████████ Client Implementation (4h)
│██████ Offline Mode Support (2h)

Documentation │██████ SDK Usage Guide (2h)

─────────────────────────────────────────────────────────────────────────────

Day 10: CHECKPOINT 5 - Client SDK Complete
─────────────────────────────────────────────────────────────────────────────
Backend │█████████ SDK Integration Tests (3h)
│███ Publish SDK (1h) ◄── CHECKPOINT 5
│██████ Integrate with coditect-core (2h)

Documentation │██████ Complete Integration Guide (2h)

│ ✅ MVP COMPLETE
─────────────────────────────────────────────────────────────────────────────

LEGEND:
████ = Work in progress (1 block = ~30 minutes)
◄── = Coordination checkpoint (requires sync across streams)
⚠️ = Critical path task (cannot be parallelized)
⏸️ = Standby (agent available for reassignment if needed)

Key Insights from Dependency Analysis

1. True Parallelization Windows

Day 1 (Maximum Parallelization):

  • 4 agents working simultaneously
  • 5 tasks executing in parallel
  • 12 hours of work compressed into 4-hour window
  • Speedup: 3x faster than sequential

Day 2-3 (High Parallelization):

  • 3-4 agents working simultaneously
  • 4-5 tasks executing in parallel
  • 10 hours of work compressed into 4-hour window
  • Speedup: 2.5x faster than sequential

Day 4-5 (Moderate Parallelization):

  • 2-3 agents working simultaneously
  • 3-4 tasks executing in parallel
  • 8 hours of work compressed into 4-hour window
  • Speedup: 2x faster than sequential

Day 6-7 (Low Parallelization):

  • 2 agents working simultaneously
  • 2-3 tasks executing in parallel
  • Critical path dominates (deployment)
  • Speedup: 1.5x faster than sequential

2. Bottleneck Tasks (Blocking Multiple Downstream Tasks)

Top 5 Bottlenecks:

  1. Backend Complete (Day 5) - Blocks Dockerfile build, CI/CD, Deploy
  2. Cloud KMS Deployed (Day 2) - Blocks KMS Integration, License Signing
  3. Identity Platform Deployed (Day 2) - Blocks JWT Validation, OAuth
  4. Database Models (Day 2) - Blocks all License Endpoints
  5. Deploy to GKE (Day 7) - Blocks Client SDK development

Mitigation:

  • Prioritize bottleneck tasks (start early)
  • Provide mocks for dependencies (e.g., mock KMS signing during development)
  • Buffer time after bottlenecks for integration issues

3. Tasks with Zero Dependencies (Can Start Immediately)

Day 1 Kickoff (Parallel Start):

  1. Cloud KMS Module
  2. Identity Platform Module
  3. FastAPI Project Setup
  4. Dockerfile Skeleton
  5. K8s Base Manifests
  6. Architecture Documentation

Strategy: Assign all 5 agents on Day 1 to maximize early progress

4. Tasks with High Fan-Out (Many Parallel Opportunities)

Infrastructure Deployed ✅ → Enables 6 parallel tasks Day 1 Backend Complete (Day 5) → Enables 4 parallel tasks Day 6 Production Deployed (Day 7) → Enables 3 parallel tasks Day 9

Strategy: Ensure high fan-out tasks complete on schedule to unlock parallelization


Risk Heatmap

TaskComplexityDependenciesFailure ImpactRisk Score
Deploy to GKEHigh12 tasksBlocks MVP🔴 Critical
Backend CompleteHigh8 tasksBlocks Deploy🔴 Critical
Cloud KMS DeployMedium1 taskBlocks Signing🟡 High
Identity PlatformMedium1 taskBlocks OAuth🟡 High
Comprehensive TestsHigh7 tasksBlocks Backend🟡 High
Database ModelsMedium1 taskBlocks Endpoints🟡 High
License EndpointsHigh3 tasksBlocks Tests🟡 High
CI/CD WorkflowMedium2 tasksDelays Deploy🟢 Medium
DockerfileLow1 taskDelays Deploy🟢 Medium
K8s ManifestsLow0 tasksDelays Deploy🟢 Low
DocumentationLow0 tasksNon-blocking🟢 Low
Client SDKMedium1 taskPost-MVP🟢 Low

Risk Mitigation Priority:

  1. 🔴 Critical tasks: Allocate most experienced agents, add buffer time
  2. 🟡 High tasks: Daily status checks, early warning system
  3. 🟢 Medium/Low tasks: Standard monitoring

Dependency Graph Version: 1.0 Date: 2025-11-30 Purpose: Visual reference for parallel execution planning Next: Use with parallel-execution-analysis.md for agent assignment