Architecture Decision Records (ADRs)

Coditect Activity Dashboard

Document Version: 1.0
Date: November 27, 2025


Index of ADRs

IDTitleStatusDate
ADR-001Task-Centric Dashboard ArchitectureAccepted2025-11-27
ADR-002Checkbox as Source of Truth for ProgressAccepted2025-11-27
ADR-003Exception-Based Display PatternAccepted2025-11-27
ADR-004Session-to-Task Linking StrategyAccepted2025-11-27
ADR-005Real-Time Update ArchitectureAccepted2025-11-27
ADR-006Three-Level Information HierarchyAccepted2025-11-27
ADR-007Activity Feed Prioritization AlgorithmAccepted2025-11-27
ADR-008Multi-Project Portfolio ArchitectureAccepted2025-11-27

ADR-001: Task-Centric Dashboard Architecture

Status

Accepted

Context

The initial Activity Dashboard implementation displayed metrics centered around LLM sessions and conversations: message counts, session durations, token usage, and QA scores. User research revealed that stakeholders found this information to be "engine diagnostics" rather than actionable intelligence.

Stakeholder quote: "The gold isn't in how is it doing it... the real stuff is features, deliverables, targets reached."

Users need to understand project progress in terms of deliverables (tasks/features) rather than the machinery used to produce them (sessions/messages).

Decision

We will architect the dashboard around tasks as the primary entity, with sessions, commits, and other activities serving as supporting evidence linked to tasks.

The information hierarchy will be:

TASK (Primary)
├── Status (pending/in_progress/review/blocked/done)
├── Checkbox (checked/unchecked)
├── Linked Sessions (evidence)
└── Linked Commits (evidence)

All dashboard views will be organized by task status and progress, not by session or conversation metrics.

Consequences

Positive:

  • Dashboard directly answers "What has been accomplished?"
  • Users can track deliverables without understanding session mechanics
  • Progress metrics are meaningful and actionable
  • Aligns with existing mental models (Kanban, JIRA, etc.)

Negative:

  • Requires building task-linking infrastructure
  • Session/message metrics are hidden (may frustrate some users)
  • Additional complexity in data transformation layer

Risks:

  • Linking accuracy may impact trust in the system
  • Tasks without linked evidence may appear incomplete

Alternatives Considered

  1. Session-centric with task tags: Keep session focus, add task tags

    • Rejected: Still requires users to think in terms of sessions
  2. Dual view (sessions + tasks): Provide both perspectives

    • Rejected: Adds complexity, dilutes focus, violates "GPS not engine" principle
  3. Hybrid timeline: Chronological view mixing tasks and sessions

    • Rejected: Doesn't provide clear progress indication

ADR-002: Checkbox as Source of Truth for Progress

Status

Accepted

Context

Progress tracking can be derived from multiple signals:

  • Task status field (pending/in_progress/etc.)
  • Checkbox state (checked/unchecked)
  • Linked commit count
  • Session activity
  • Time-based estimates

We need a single, unambiguous source of truth for "task completion" that is:

  • Simple to understand
  • Easy to update
  • Binary (complete or not)
  • User-controlled

Decision

The checked boolean field on tasks will be the authoritative source for completion status.

Progress calculation: progress_pct = checked_tasks / total_tasks * 100

The status field provides additional workflow information but does not determine completion:

  • A task can be status='review' but checked=false (not yet complete)
  • A task with checked=true should have status='done' (enforced by application logic)

Consequences

Positive:

  • Unambiguous: task is either done (checked) or not done (unchecked)
  • User has explicit control over completion state
  • Familiar UX pattern (checkbox lists)
  • Simple progress calculation
  • Works offline (no need for complex calculations)

Negative:

  • Binary view may not capture partial progress
  • Status field becomes secondary, potentially confusing
  • Requires discipline to check tasks appropriately

Mitigation:

  • UI shows both checkbox and status for context
  • In-progress tasks can show sub-progress indicators separately
  • Validation ensures checked=true implies status='done'

Alternatives Considered

  1. Status-based completion: status='done' means complete

    • Rejected: Status is mutable for workflow; checkbox is definitive
  2. Points/effort-based: Calculate from story points completed

    • Rejected: Requires estimation, adds complexity
  3. Commit-based: Complete when PR merged

    • Rejected: Not all tasks have code; tight coupling to git

ADR-003: Exception-Based Display Pattern

Status

Accepted

Context

Dashboard displays often show all available metrics regardless of their informational value. This leads to:

  • Visual clutter
  • Important information buried in noise
  • User fatigue from scanning uniform data

Stakeholder quote: "If it's 40, 40, 40, 40, 40 every time, don't show it."

The principle of "assumptive baseline" suggests that uniform data provides no signal and should be hidden, with only deviations (exceptions) surfaced.

Decision

We will implement exception-based display where uniform/expected values are hidden and only anomalies are shown.

Implementation rules:

MetricBaselineShow If
QA Score40 (passing)score < 40 (failing)
Task Statuspending/in_progress/donestatus = 'blocked'
VersionLatestversion differs from expected
Build StatusSuccessstatus = 'failed'

The "Attention Required" panel will exclusively show exceptions:

  • Blocked tasks
  • Failed builds
  • Low QA scores
  • Overdue tasks

Consequences

Positive:

  • Dramatically reduced visual noise
  • Important issues immediately visible
  • Faster scanning and decision-making
  • Cleaner, more professional UI

Negative:

  • Users may wonder "where is my data?"
  • Need to define baselines for each metric
  • Edge cases where uniform data is actually informative

Mitigation:

  • Drill-down views show all data for those who want it
  • Tooltips explain why data is hidden
  • Configurable baselines per organization

Alternatives Considered

  1. Show everything, highlight exceptions: Display all, use color coding

    • Rejected: Still cluttered; highlighting loses impact
  2. Collapsible sections: Hide by default, expand to see

    • Rejected: Adds interaction overhead; violates "non-scrolling" goal
  3. Threshold indicators: Show sparklines/trends instead of values

    • Partially adopted: Trends shown for velocity, not raw counts

ADR-004: Session-to-Task Linking Strategy

Status

Accepted

Context

LLM sessions contain conversations that work toward completing tasks, but there is no explicit link between them. To provide task-centric views, we need to infer which tasks a session was working on.

Linking strategies considered:

  1. Explicit user tagging
  2. Keyword extraction and matching
  3. NLP-based semantic similarity
  4. File path overlap with commits

Decision

We will use a multi-strategy linking approach with confidence scores:

Link Strategies (in priority order):
1. Explicit references (confidence: 1.0)
- Task ID mentioned in session: "working on TASK-123"

2. Title similarity (confidence: 0.5-0.9)
- Session content matches task title (threshold: 0.7)

3. Keyword extraction (confidence: 0.3-0.8)
- NLP keywords match task description
- Minimum 3 keyword matches required

4. File overlap (confidence: 0.3-0.6)
- Session mentions files also in task-linked commits

Links with confidence < 0.3 are discarded. Multiple strategies can combine to increase confidence (capped at 0.95 for inferred links).

Consequences

Positive:

  • Automatic linking reduces user burden
  • Confidence scores allow filtering unreliable links
  • Multiple strategies improve coverage
  • Explicit references provide escape hatch for users

Negative:

  • Inference may produce false positives
  • NLP processing adds latency
  • Confidence calibration requires tuning
  • Users may not understand why links appear

Mitigation:

  • Show confidence indicators in drill-down views
  • Allow users to confirm/reject inferred links
  • Log linking decisions for debugging
  • Periodic accuracy audits

Alternatives Considered

  1. Explicit tagging only: Require users to tag sessions

    • Rejected: High friction, users won't do it consistently
  2. LLM-based linking: Use Claude to analyze and link

    • Rejected: Expensive, adds latency, recursive complexity
  3. No linking: Show sessions separately from tasks

    • Rejected: Defeats the task-centric architecture goal

ADR-005: Real-Time Update Architecture

Status

Accepted

Context

The dashboard displays time-sensitive information (task status, progress, blockers) that can change frequently. Users expect to see updates without manual refresh, especially in collaborative environments.

Options for real-time updates:

  1. Polling (client periodically fetches)
  2. Server-Sent Events (SSE)
  3. WebSockets
  4. GraphQL Subscriptions

Decision

We will use WebSockets for real-time dashboard updates with a pub/sub model.

Architecture:

┌─────────────┐      ┌─────────────┐      ┌─────────────┐
│ Client │◄────►│ WebSocket │◄────►│ Event Bus │
│ │ │ Manager │ │ (Pub/Sub) │
└─────────────┘ └─────────────┘ └─────────────┘


┌───────────────────────────┤
│ │ │
┌──────┴──────┐ ┌──┴───┐ ┌────────┴────────┐
│Task Service │ │Git │ │Session Service │
│ │ │Hook │ │ │
└─────────────┘ └──────┘ └─────────────────┘

Event types:

  • task.updated: Task status or checkbox changed
  • task.completed: Task checked off
  • task.blocked: Task became blocked
  • commit.new: New commit received
  • session.ended: Session completed
  • progress.changed: Project progress recalculated

Clients subscribe to specific project IDs to receive relevant updates.

Consequences

Positive:

  • Instant updates without polling overhead
  • Efficient bandwidth usage (push-only)
  • Supports collaborative workflows
  • Scalable with connection pooling

Negative:

  • More complex than polling
  • Requires connection management
  • Stateful connections harder to scale
  • Fallback needed for WebSocket-blocked networks

Mitigation:

  • Implement automatic reconnection with exponential backoff
  • Fall back to polling if WebSocket fails
  • Use Redis pub/sub for horizontal scaling
  • Heartbeat to detect stale connections

Alternatives Considered

  1. Polling every 30 seconds: Simple, stateless

    • Rejected: Delays updates, wastes bandwidth on no-change
  2. SSE (Server-Sent Events): Simpler than WebSockets

    • Rejected: One-directional; we need client-to-server for subscriptions
  3. GraphQL Subscriptions: Integrated with query layer

    • Rejected: Adds GraphQL dependency; overkill for our needs

ADR-006: Three-Level Information Hierarchy

Status

Accepted

Context

Users have different information needs at different times:

  • Quick status check: "Am I on track?"
  • Working session: "What should I work on next?"
  • Deep investigation: "Why did this task take so long?"

A single view cannot serve all these needs without becoming cluttered or requiring excessive scrolling.

Stakeholder quote: "We need actual information on a non-scrolling screen."

Decision

We will implement a three-level information hierarchy with progressive disclosure:

LEVEL 1: Primary View (Non-scrolling)
├── Portfolio summary (all projects)
├── Task Kanban (selected project)
├── 5 activity highlights
├── Blocked tasks (exceptions only)
└── Work distribution chart

LEVEL 2: Drill-Down (On-demand)
├── Full task list with details
├── Commit timeline
├── Session summaries
├── Progress burndown
└── All activity (paginated)

LEVEL 3: Deep Inspection (Hidden)
├── Session message history
├── Commit diffs
├── Task change history
├── Raw activity logs
└── Token/cost analytics

Level 1 must fit on one screen without scrolling (approximately 800px viewport height).

Consequences

Positive:

  • Primary view provides immediate answers
  • Detail available for those who need it
  • Reduced cognitive load for daily use
  • Cleaner visual design

Negative:

  • Important details may be hidden
  • More clicks to access deep information
  • Need to carefully curate Level 1 content
  • Responsive design challenges

Mitigation:

  • User research to validate Level 1 content selection
  • Keyboard shortcuts for quick drill-down
  • Breadcrumb navigation between levels
  • Mobile-specific layouts for Level 1

Alternatives Considered

  1. Single scrolling view: Everything on one page

    • Rejected: Violates "non-scrolling" requirement
  2. Tabbed interface: Tabs for different aspects

    • Rejected: Hides information, adds navigation overhead
  3. Dashboard widgets: Customizable widget layout

    • Future consideration: Too complex for MVP

ADR-007: Activity Feed Prioritization Algorithm

Status

Accepted

Context

The activity feed shows recent events but is limited to 5 items (per ADR-006). With multiple activity sources (tasks, commits, sessions, status changes), we need a principled way to select which items appear.

Not all activities are equally important:

  • Task completion = high value (deliverable achieved)
  • Task blocked = high value (needs attention)
  • Commit = medium value (work evidence)
  • Session started = low value (just process)

Decision

We will use weighted prioritization with recency as secondary sort:

PRIORITY_WEIGHTS = {
'task_completed': 100, # Highest: deliverable achieved
'task_blocked': 90, # High: needs attention
'commit_merged': 60, # Medium-high: code shipped
'commit_pushed': 50, # Medium: work evidence
'status_change': 40, # Medium-low: workflow update
'session_ended': 30, # Low: just process
'session_started': 10, # Lowest: minimal value
}

Algorithm:
1. Collect activities from last 7 days
2. Assign priority score based on type
3. Sort by (priority DESC, timestamp DESC)
4. Take top 5

Additionally:

  • Deduplicate: Only show latest event per task
  • Cap commits: Max 2 commits in top 5
  • Boost blockers: Always show if any exist (even if older)

Consequences

Positive:

  • Important events reliably surface
  • Balanced representation across activity types
  • Blockers always visible (exception-based)
  • Predictable, explainable algorithm

Negative:

  • Lower-priority events may never appear
  • Weight tuning may need iteration
  • Edge cases (many completions at once)

Mitigation:

  • "View all activity" link for full list
  • Weights configurable per organization
  • Monitoring for coverage metrics

Alternatives Considered

  1. Pure recency: Most recent 5 activities

    • Rejected: Low-value events dominate
  2. Per-type slots: 2 tasks + 2 commits + 1 other

    • Rejected: Rigid; doesn't adapt to actual activity
  3. ML-based ranking: Learn from user engagement

    • Future consideration: Insufficient data for MVP

ADR-008: Multi-Project Portfolio Architecture

Status

Accepted

Context

Users work on multiple projects simultaneously and need a unified view across all of them. The dashboard must support:

  • Overview of all projects at once
  • Drill-down to single project
  • Cross-project activity feed
  • Cross-project blocker detection

Decision

We will implement a portfolio model with project-level isolation and cross-project aggregation:

Portfolio (User/Org level)
├── Project A
│ ├── Git Repo(s)
│ ├── Project Plan
│ │ └── Task Lists
│ │ └── Tasks
│ └── LLM Sessions
├── Project B
│ └── ...
└── Project N
└── ...

Dashboard modes:

  1. Portfolio mode (default): All projects visible

    • Summary bar shows all projects
    • Activity feed aggregates across projects
    • Blockers shown from all projects
  2. Project mode (on selection): Single project focus

    • Kanban board for selected project
    • Activity filtered to project
    • Project-specific metrics

Data isolation:

  • Tasks belong to exactly one project (via task_list → project_plan → project)
  • Sessions belong to exactly one project
  • Commits belong to repo → project (many repos per project possible)

Consequences

Positive:

  • Clear organizational structure
  • Supports both overview and detail needs
  • Natural project-level access control
  • Scalable to many projects

Negative:

  • Cross-project tasks not supported
  • Project switching adds interaction
  • Portfolio view may be crowded with many projects

Mitigation:

  • Project filtering/favorites for portfolio view
  • Quick project switcher (keyboard shortcut)
  • Consider "workspace" level above portfolio for enterprises

Alternatives Considered

  1. Flat task list: All tasks in one pool, tagged by project

    • Rejected: Harder to manage, loses project context
  2. Project silos: Completely separate dashboards per project

    • Rejected: No unified view, high switching cost
  3. Hierarchical workspaces: Org → Workspace → Project

    • Future consideration: Over-engineering for MVP

Appendix: ADR Template

## ADR-XXX: [Title]

### Status
[Proposed | Accepted | Deprecated | Superseded by ADR-YYY]

### Context
[Describe the issue or question being addressed. What problem are we solving?]

### Decision
[Describe the decision made and the reasoning behind it.]

### Consequences
**Positive:**
- [Benefit 1]
- [Benefit 2]

**Negative:**
- [Drawback 1]
- [Drawback 2]

**Mitigation:**
- [How we address the drawbacks]

### Alternatives Considered
1. **[Alternative 1]**: [Description]
- Rejected: [Reason]

Document History

VersionDateAuthorChanges
1.02025-11-27Architecture TeamInitial 8 ADRs