Production Readiness Checklist
CODITECT Document Management System
Version: 1.0.0 Date: 2025-12-28 Status: Pre-Production Review
Quick Start
Step 1: Initial Setup
First, configure your environment.
Step 2: Run the Process
Execute the main workflow.
Step 3: Verify Results
Confirm everything works correctly.
Prerequisites
Before starting, ensure you have:
- Required tools installed
- Access to necessary resources
- Basic understanding of concepts
Verify setup:
# Verification command
1. Infrastructure Readiness
1.1 Compute Resources
- GKE cluster provisioned with required node pools
- Cloud Run services configured with appropriate scaling
- Container images built and pushed to GCR
- Resource limits (CPU/Memory) set per workload type
- Horizontal Pod Autoscaler (HPA) configured (3-20 replicas)
- Pod Disruption Budget (PDB) set (minAvailable: 2)
1.2 Networking
- VPC and subnets configured
- Cloud NAT for egress traffic
- Load balancer with SSL termination
- Cloud Armor security policies applied
- DNS records configured (dms.coditect.ai, dms-api.coditect.ai)
- SSL/TLS certificates provisioned (managed certificates)
- Network policies restricting pod-to-pod traffic
1.3 Database
- Cloud SQL PostgreSQL instance provisioned
- pgvector extension enabled for embeddings
- Read replicas configured for high availability
- Automated backups enabled (daily, 7-day retention)
- Point-in-time recovery enabled
- Connection pooling configured (pgBouncer or Cloud SQL Proxy)
1.4 Cache & Queue
- Memorystore Redis provisioned
- Redis cluster mode for high availability (if needed)
- Celery workers deployed and connected
- Task queues configured (default, embeddings, processing)
2. Security Readiness
2.1 Authentication & Authorization
- JWT authentication implemented and tested
- API key authentication for programmatic access
- RBAC roles defined (Owner, Admin, Editor, Viewer, API_Only)
- 25+ granular permissions configured
- Token expiration and refresh implemented
- Rate limiting per tenant/user
2.2 Secrets Management
- All secrets stored in Secret Manager
- No hardcoded credentials in code
- Service accounts with minimal permissions
- API keys rotatable without downtime
- Stripe webhook secret secured
2.3 Data Protection
- Row-level security (RLS) enabled for tenant isolation
- Data encrypted at rest (default in GCP)
- Data encrypted in transit (TLS 1.3)
- PII handling compliant with policies
- Audit logging for sensitive operations
2.4 Security Testing
- OWASP Top 10 vulnerabilities tested
- No SQL injection vulnerabilities
- No XSS vulnerabilities
- No CSRF vulnerabilities
- No SSRF vulnerabilities
- Dependency vulnerability scan passed
- Container image scan passed
3. Monitoring & Observability
3.1 Metrics
- Prometheus ServiceMonitor configured
- Application metrics exposed (/metrics)
- Custom business metrics (documents, searches, embeddings)
- Resource metrics (CPU, memory, disk)
- Database connection pool metrics
3.2 Logging
- Structured JSON logging implemented
- Log levels appropriately set (INFO for prod)
- Request/response logging (sanitized)
- Error tracking with stack traces
- Logs shipped to Cloud Logging
3.3 Alerting
- SLO alerts configured (99.9% availability)
- Error rate alerts (>5% warning, >10% critical)
- Latency alerts (P95 >2s)
- Resource exhaustion alerts
- On-call rotation configured
- Runbook links in alert annotations
3.4 Dashboards
- Grafana dashboard deployed
- API overview (RPS, latency, errors)
- Resource utilization dashboard
- Business metrics dashboard
- SLO dashboard
4. Testing & Quality
4.1 Test Coverage
- Unit test coverage ≥80%
- Integration tests for all endpoints
- Contract tests for external APIs
- All tests passing in CI
4.2 Performance
- Load testing completed (1,000 concurrent users)
- P95 latency <100ms under load
- Throughput meets requirements (100+ RPS)
- No memory leaks detected
- Database query performance optimized
4.3 Quality Gates
- Code review completed
- Security review completed
- Architecture review completed
- No critical/high severity bugs
5. Deployment Readiness
5.1 CI/CD Pipeline
- GitHub Actions workflow configured
- Automated testing on PR
- Container build and push automated
- Deployment to staging automated
- Production deployment requires approval
5.2 Deployment Configuration
- Kubernetes manifests validated
- Cloud Run service.yaml validated
- Environment variables configured
- Secrets mounted from Secret Manager
- Health probes configured (liveness, readiness)
5.3 Rollback Strategy
- Blue-green or canary deployment configured
- Rollback procedure documented
- Database migration rollback plan
- Previous version retention (5 versions)
6. Operational Readiness
6.1 Documentation
- API documentation (OpenAPI/Swagger)
- Architecture documentation
- Runbook for common operations
- Incident response procedures
- On-call handbook
6.2 Support
- Support channels configured
- Escalation paths defined
- SLA commitments documented
- Customer communication templates
6.3 Disaster Recovery
- Backup strategy documented
- Recovery Time Objective (RTO) <1 hour
- Recovery Point Objective (RPO) <1 hour
- DR drill completed successfully
- Failover procedure documented
7. Compliance & Legal
7.1 Data Governance
- Data retention policies defined
- Data deletion procedures in place
- GDPR compliance (if applicable)
- SOC 2 controls implemented (if applicable)
7.2 Terms & Policies
- Terms of Service published
- Privacy Policy published
- Acceptable Use Policy defined
- SLA published
8. Business Readiness
8.1 Billing
- Stripe integration tested
- Subscription tiers configured
- Checkout flow tested
- Billing portal accessible
- Invoice generation working
8.2 Customer Onboarding
- Sign-up flow tested
- Email verification working
- Welcome email configured
- Getting started guide available
Sign-off
| Role | Name | Date | Signature |
|---|---|---|---|
| Engineering Lead | |||
| Security Lead | |||
| Operations Lead | |||
| Product Owner | |||
| CTO |
Final Checklist Summary
Total Items: 100+ Completed: ___ Remaining: ___ Blockers: ___
Go/No-Go Decision: [ ] GO [ ] NO-GO
Notes: