Peak Demand Management Workflow
Monitor and manage peak demand to reduce demand charges and system stress.
Complexity: High | Duration: 15-30m | Category: Industry/Energy Utilities
Tags: peak-demand demand-management load-shifting cost-reduction
Workflow Diagram
Steps
Step 1: Monitor real
Agent: time demand
Step 2: Forecast peak periods
Forecast peak periods
Step 3: Activate load curtailment
Activate load curtailment
Step 4: Dispatch onsite generation
Dispatch onsite generation
Step 5: Utilize energy storage
Utilize energy storage
Step 6: Shift flexible loads
Shift flexible loads
Step 7: Track demand against target
Track demand against target
Step 8: Calculate demand charge saving
Calculate demand charge savings
Step 9: Analyze peak events
Analyze peak events
Step 10: Optimize peak management strat
Optimize peak management strategy
Usage
To execute this workflow:
/workflow industry/energy-utilities/peak-demand-management-workflow.workflow
Related Workflows
See other workflows in this category for related automation patterns.