Skip to main content

Peak Demand Management Workflow

Monitor and manage peak demand to reduce demand charges and system stress.

Complexity: High | Duration: 15-30m | Category: Industry/Energy Utilities

Tags: peak-demand demand-management load-shifting cost-reduction

Workflow Diagram

Steps

Step 1: Monitor real

Agent: time demand

Step 2: Forecast peak periods

Forecast peak periods

Step 3: Activate load curtailment

Activate load curtailment

Step 4: Dispatch onsite generation

Dispatch onsite generation

Step 5: Utilize energy storage

Utilize energy storage

Step 6: Shift flexible loads

Shift flexible loads

Step 7: Track demand against target

Track demand against target

Step 8: Calculate demand charge saving

Calculate demand charge savings

Step 9: Analyze peak events

Analyze peak events

Step 10: Optimize peak management strat

Optimize peak management strategy

Usage

To execute this workflow:

/workflow industry/energy-utilities/peak-demand-management-workflow.workflow

See other workflows in this category for related automation patterns.