Skip to main content

Yard Management Workflow

Manage trailer yard operations including spot assignments, move scheduling, and trailer status tracking.

Complexity: Medium | Duration: 15-30m | Category: Industry/Transportation Logistics

Tags: yard-management trailer-tracking detention capacity logistics

Workflow Diagram

Steps

Step 1: Track trailer arrivals and dep

Track trailer arrivals and departures

Step 2: Assign optimal spot locations

Assign optimal spot locations

Step 3: Schedule yard moves by priorit

Schedule yard moves by priority

Step 4: Dispatch yard tractors

Dispatch yard tractors

Step 5: Update trailer status (empty,

Update trailer status (empty, loaded, sealed)

Step 6: Manage detention time

Manage detention time

Step 7: Coordinate dock door assignmen

Coordinate dock door assignments

Step 8: Track yard inventory

Track yard inventory

Step 9: Report on yard capacity

Report on yard capacity

Step 10: Optimize yard utilization

Optimize yard utilization

Usage

To execute this workflow:

/workflow industry/transportation-logistics/yard-management-workflow.workflow

See other workflows in this category for related automation patterns.